Schedule III - Real Estate and Accumulated Depreciation (Detail) - USD ($) $ in Thousands |
12 Months Ended |
|
|
|
Dec. 31, 2017 |
Dec. 31, 2016 |
Dec. 31, 2015 |
Dec. 31, 2014 |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 452,491
|
|
|
|
Land, initial cost |
123,987
|
|
|
|
Buildings & improvements, initial cost |
731,930
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
50,933
|
|
|
|
Land, total cost |
123,323
|
|
|
|
Buildings & improvements, total cost |
783,527
|
|
|
|
Total |
906,850
|
$ 833,203
|
$ 782,276
|
$ 722,565
|
Accumulated depreciation |
153,387
|
$ 134,329
|
$ 113,089
|
$ 92,133
|
Net real estate |
753,463
|
|
|
|
Raleigh, North Carolina Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
0
|
|
|
|
Land, initial cost |
960
|
|
|
|
Buildings & improvements, initial cost |
4,481
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
35
|
|
|
|
Land, total cost |
960
|
|
|
|
Buildings & improvements, total cost |
4,516
|
|
|
|
Total |
5,476
|
|
|
|
Accumulated depreciation |
2,090
|
|
|
|
Net real estate |
$ 3,386
|
|
|
|
Year construction/ improvements |
1997
|
|
|
|
Date acquired |
Dec. 23, 2003
|
|
|
|
Canton, Ohio Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 1,574
|
|
|
|
Land, initial cost |
186
|
|
|
|
Buildings & improvements, initial cost |
3,083
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
500
|
|
|
|
Land, total cost |
187
|
|
|
|
Buildings & improvements, total cost |
3,582
|
|
|
|
Total |
3,769
|
|
|
|
Accumulated depreciation |
1,325
|
|
|
|
Net real estate |
$ 2,444
|
|
|
|
Year construction/ improvements |
1994
|
|
|
|
Date acquired |
Jan. 30, 2004
|
|
|
|
Akron, Ohio Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
1,973
|
|
|
|
Buildings & improvements, initial cost |
6,771
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
1,658
|
|
|
|
Land, total cost |
1,974
|
|
|
|
Buildings & improvements, total cost |
8,428
|
|
|
|
Total |
10,402
|
|
|
|
Accumulated depreciation |
2,628
|
|
|
|
Net real estate |
$ 7,774
|
|
|
|
Year construction/ improvements |
1968
|
|
|
|
Year construction/improvements one |
1999
|
|
|
|
Date acquired |
Apr. 29, 2004
|
|
|
|
Charlotte, North Carolina Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 6,757
|
|
|
|
Land, initial cost |
740
|
|
|
|
Buildings & improvements, initial cost |
8,423
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
61
|
|
|
|
Land, total cost |
741
|
|
|
|
Buildings & improvements, total cost |
8,483
|
|
|
|
Total |
9,224
|
|
|
|
Accumulated depreciation |
2,981
|
|
|
|
Net real estate |
$ 6,243
|
|
|
|
Year construction/ improvements |
1984
|
|
|
|
Year construction/improvements one |
1995
|
|
|
|
Date acquired |
Jun. 30, 2004
|
|
|
|
Canton, North Carolina Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 3,412
|
|
|
|
Land, initial cost |
150
|
|
|
|
Buildings & improvements, initial cost |
5,050
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
7,285
|
|
|
|
Land, total cost |
150
|
|
|
|
Buildings & improvements, total cost |
12,335
|
|
|
|
Total |
12,485
|
|
|
|
Accumulated depreciation |
2,349
|
|
|
|
Net real estate |
$ 10,136
|
|
|
|
Year construction/ improvements |
1998
|
|
|
|
Year construction/improvements one |
2014
|
|
|
|
Date acquired |
Jul. 06, 2004
|
|
|
|
Crenshaw, Pennsylvania Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 4,116
|
|
|
|
Land, initial cost |
100
|
|
|
|
Buildings & improvements, initial cost |
6,574
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
269
|
|
|
|
Land, total cost |
100
|
|
|
|
Buildings & improvements, total cost |
6,843
|
|
|
|
Total |
6,943
|
|
|
|
Accumulated depreciation |
2,368
|
|
|
|
Net real estate |
$ 4,575
|
|
|
|
Year construction/ improvements |
1991
|
|
|
|
Date acquired |
Aug. 05, 2004
|
|
|
|
Lexington, North Carolina Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 2,398
|
|
|
|
Land, initial cost |
820
|
|
|
|
Buildings & improvements, initial cost |
2,107
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
69
|
|
|
|
Land, total cost |
820
|
|
|
|
Buildings & improvements, total cost |
2,176
|
|
|
|
Total |
2,996
|
|
|
|
Accumulated depreciation |
778
|
|
|
|
Net real estate |
$ 2,218
|
|
|
|
Year construction/ improvements |
1986
|
|
|
|
Date acquired |
Aug. 05, 2004
|
|
|
|
Austin, Texas Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
1,000
|
|
|
|
Buildings & improvements, initial cost |
6,296
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
703
|
|
|
|
Land, total cost |
1,000
|
|
|
|
Buildings & improvements, total cost |
6,999
|
|
|
|
Total |
7,999
|
|
|
|
Accumulated depreciation |
2,280
|
|
|
|
Net real estate |
$ 5,719
|
|
|
|
Year construction/ improvements |
2001
|
|
|
|
Date acquired |
Sep. 16, 2004
|
|
|
|
Mt. Pocono, Pennsylvania Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
350
|
|
|
|
Buildings & improvements, initial cost |
5,819
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
18
|
|
|
|
Land, total cost |
350
|
|
|
|
Buildings & improvements, total cost |
5,837
|
|
|
|
Total |
6,187
|
|
|
|
Accumulated depreciation |
2,007
|
|
|
|
Net real estate |
$ 4,180
|
|
|
|
Year construction/ improvements |
1995
|
|
|
|
Year construction/improvements one |
1999
|
|
|
|
Date acquired |
Oct. 15, 2004
|
|
|
|
San Antonio, Texas Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
843
|
|
|
|
Buildings & improvements, initial cost |
7,514
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
724
|
|
|
|
Land, total cost |
843
|
|
|
|
Buildings & improvements, total cost |
8,238
|
|
|
|
Total |
9,081
|
|
|
|
Accumulated depreciation |
3,065
|
|
|
|
Net real estate |
$ 6,016
|
|
|
|
Year construction/ improvements |
1999
|
|
|
|
Date acquired |
Feb. 10, 2005
|
|
|
|
Big Flats, New York Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 2,240
|
|
|
|
Land, initial cost |
275
|
|
|
|
Buildings & improvements, initial cost |
6,459
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
34
|
|
|
|
Land, total cost |
275
|
|
|
|
Buildings & improvements, total cost |
6,493
|
|
|
|
Total |
6,768
|
|
|
|
Accumulated depreciation |
2,123
|
|
|
|
Net real estate |
$ 4,645
|
|
|
|
Year construction/ improvements |
2001
|
|
|
|
Date acquired |
Apr. 15, 2005
|
|
|
|
Wichita, Kansas Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
1,525
|
|
|
|
Buildings & improvements, initial cost |
9,703
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
77
|
|
|
|
Land, total cost |
1,525
|
|
|
|
Buildings & improvements, total cost |
9,780
|
|
|
|
Total |
11,305
|
|
|
|
Accumulated depreciation |
3,255
|
|
|
|
Net real estate |
$ 8,050
|
|
|
|
Year construction/ improvements |
2000
|
|
|
|
Date acquired |
May 18, 2005
|
|
|
|
Arlington, Texas Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
636
|
|
|
|
Buildings & improvements, initial cost |
3,695
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
819
|
|
|
|
Land, total cost |
636
|
|
|
|
Buildings & improvements, total cost |
4,514
|
|
|
|
Total |
5,150
|
|
|
|
Accumulated depreciation |
1,349
|
|
|
|
Net real estate |
$ 3,801
|
|
|
|
Year construction/ improvements |
1966
|
|
|
|
Date acquired |
May 26, 2005
|
|
|
|
Eatontown, New Jersey Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 2,814
|
|
|
|
Land, initial cost |
1,351
|
|
|
|
Buildings & improvements, initial cost |
3,520
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
534
|
|
|
|
Land, total cost |
1,351
|
|
|
|
Buildings & improvements, total cost |
4,054
|
|
|
|
Total |
5,405
|
|
|
|
Accumulated depreciation |
1,356
|
|
|
|
Net real estate |
$ 4,049
|
|
|
|
Year construction/ improvements |
1991
|
|
|
|
Date acquired |
Jul. 07, 2005
|
|
|
|
Duncan, South Carolina Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 9,252
|
|
|
|
Land, initial cost |
783
|
|
|
|
Buildings & improvements, initial cost |
10,790
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
1,717
|
|
|
|
Land, total cost |
783
|
|
|
|
Buildings & improvements, total cost |
12,507
|
|
|
|
Total |
13,290
|
|
|
|
Accumulated depreciation |
3,935
|
|
|
|
Net real estate |
$ 9,355
|
|
|
|
Year construction/ improvements |
1984
|
|
|
|
Year construction/improvements one |
2001
|
|
|
|
Year construction/improvements two |
2007
|
|
|
|
Date acquired |
Jul. 14, 2005
|
|
|
|
Duncan, South Carolina Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 2,300
|
|
|
|
Land, initial cost |
195
|
|
|
|
Buildings & improvements, initial cost |
2,682
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
427
|
|
|
|
Land, total cost |
195
|
|
|
|
Buildings & improvements, total cost |
3,109
|
|
|
|
Total |
3,304
|
|
|
|
Accumulated depreciation |
978
|
|
|
|
Net real estate |
$ 2,326
|
|
|
|
Year construction/ improvements |
1984
|
|
|
|
Year construction/improvements one |
2001
|
|
|
|
Year construction/improvements two |
2007
|
|
|
|
Date acquired |
Jul. 14, 2005
|
|
|
|
Clintonville, Wisconsin Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
55
|
|
|
|
Buildings & improvements, initial cost |
4,717
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
3,250
|
|
|
|
Land, total cost |
55
|
|
|
|
Buildings & improvements, total cost |
7,967
|
|
|
|
Total |
8,022
|
|
|
|
Accumulated depreciation |
1,990
|
|
|
|
Net real estate |
$ 6,032
|
|
|
|
Year construction/ improvements |
1992
|
|
|
|
Year construction/improvements one |
2013
|
|
|
|
Date acquired |
Oct. 31, 2005
|
|
|
|
Maple Heights, Ohio Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 4,000
|
|
|
|
Land, initial cost |
1,609
|
|
|
|
Buildings & improvements, initial cost |
10,065
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
1,479
|
|
|
|
Land, total cost |
1,609
|
|
|
|
Buildings & improvements, total cost |
11,544
|
|
|
|
Total |
13,153
|
|
|
|
Accumulated depreciation |
4,412
|
|
|
|
Net real estate |
$ 8,741
|
|
|
|
Year construction/ improvements |
1974
|
|
|
|
Date acquired |
Dec. 21, 2005
|
|
|
|
Richmond, Virginia Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
736
|
|
|
|
Buildings & improvements, initial cost |
5,336
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
62
|
|
|
|
Land, total cost |
736
|
|
|
|
Buildings & improvements, total cost |
5,398
|
|
|
|
Total |
6,134
|
|
|
|
Accumulated depreciation |
1,698
|
|
|
|
Net real estate |
$ 4,436
|
|
|
|
Year construction/ improvements |
1972
|
|
|
|
Date acquired |
Dec. 30, 2005
|
|
|
|
South Hadley, Massachusetts Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
471
|
|
|
|
Buildings & improvements, initial cost |
2,765
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
(949)
|
|
|
|
Land, total cost |
270
|
|
|
|
Buildings & improvements, total cost |
2,017
|
|
|
|
Total |
2,287
|
|
|
|
Accumulated depreciation |
844
|
|
|
|
Net real estate |
$ 1,443
|
|
|
|
Year construction/ improvements |
1978
|
|
|
|
Date acquired |
Feb. 15, 2006
|
|
|
|
Champaign, Illinois Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 1,509
|
|
|
|
Land, initial cost |
687
|
|
|
|
Buildings & improvements, initial cost |
2,036
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
2
|
|
|
|
Land, total cost |
687
|
|
|
|
Buildings & improvements, total cost |
2,038
|
|
|
|
Total |
2,725
|
|
|
|
Accumulated depreciation |
649
|
|
|
|
Net real estate |
$ 2,076
|
|
|
|
Year construction/ improvements |
1996
|
|
|
|
Date acquired |
Feb. 21, 2006
|
|
|
|
Champaign, Illinois Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 2,959
|
|
|
|
Land, initial cost |
1,347
|
|
|
|
Buildings & improvements, initial cost |
3,992
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
4
|
|
|
|
Land, total cost |
1,347
|
|
|
|
Buildings & improvements, total cost |
3,996
|
|
|
|
Total |
5,343
|
|
|
|
Accumulated depreciation |
1,272
|
|
|
|
Net real estate |
$ 4,071
|
|
|
|
Year construction/ improvements |
1996
|
|
|
|
Date acquired |
Feb. 21, 2006
|
|
|
|
Champaign, Illinois Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 1,849
|
|
|
|
Land, initial cost |
842
|
|
|
|
Buildings & improvements, initial cost |
2,495
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
2
|
|
|
|
Land, total cost |
842
|
|
|
|
Buildings & improvements, total cost |
2,497
|
|
|
|
Total |
3,339
|
|
|
|
Accumulated depreciation |
795
|
|
|
|
Net real estate |
$ 2,544
|
|
|
|
Year construction/ improvements |
1996
|
|
|
|
Date acquired |
Feb. 21, 2006
|
|
|
|
Champaign, Illinois Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 1,691
|
|
|
|
Land, initial cost |
770
|
|
|
|
Buildings & improvements, initial cost |
2,281
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
2
|
|
|
|
Land, total cost |
770
|
|
|
|
Buildings & improvements, total cost |
2,283
|
|
|
|
Total |
3,053
|
|
|
|
Accumulated depreciation |
727
|
|
|
|
Net real estate |
$ 2,326
|
|
|
|
Year construction/ improvements |
1996
|
|
|
|
Date acquired |
Feb. 21, 2006
|
|
|
|
Burnsville, Minnesota Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 8,628
|
|
|
|
Land, initial cost |
3,511
|
|
|
|
Buildings & improvements, initial cost |
8,746
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
6,693
|
|
|
|
Land, total cost |
3,511
|
|
|
|
Buildings & improvements, total cost |
15,439
|
|
|
|
Total |
18,950
|
|
|
|
Accumulated depreciation |
4,277
|
|
|
|
Net real estate |
$ 14,673
|
|
|
|
Year construction/ improvements |
1984
|
|
|
|
Date acquired |
May 10, 2006
|
|
|
|
Menomonee Falls, Wisconsin Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
625
|
|
|
|
Buildings & improvements, initial cost |
6,911
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
686
|
|
|
|
Land, total cost |
625
|
|
|
|
Buildings & improvements, total cost |
7,597
|
|
|
|
Total |
8,222
|
|
|
|
Accumulated depreciation |
2,167
|
|
|
|
Net real estate |
$ 6,055
|
|
|
|
Year construction/ improvements |
1986
|
|
|
|
Year construction/improvements one |
2000
|
|
|
|
Date acquired |
Jun. 30, 2006
|
|
|
|
Baytown, Texas Medical Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
221
|
|
|
|
Buildings & improvements, initial cost |
2,443
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
2,451
|
|
|
|
Land, total cost |
221
|
|
|
|
Buildings & improvements, total cost |
4,894
|
|
|
|
Total |
5,115
|
|
|
|
Accumulated depreciation |
969
|
|
|
|
Net real estate |
$ 4,146
|
|
|
|
Year construction/ improvements |
1997
|
|
|
|
Date acquired |
Jul. 11, 2006
|
|
|
|
Mason, Ohio Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 3,930
|
|
|
|
Land, initial cost |
797
|
|
|
|
Buildings & improvements, initial cost |
6,258
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
540
|
|
|
|
Land, total cost |
797
|
|
|
|
Buildings & improvements, total cost |
6,798
|
|
|
|
Total |
7,595
|
|
|
|
Accumulated depreciation |
2,176
|
|
|
|
Net real estate |
$ 5,419
|
|
|
|
Year construction/ improvements |
2002
|
|
|
|
Date acquired |
Jan. 05, 2007
|
|
|
|
Raleigh, North Carolina Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
1,606
|
|
|
|
Buildings & improvements, initial cost |
5,513
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
3,749
|
|
|
|
Land, total cost |
1,606
|
|
|
|
Buildings & improvements, total cost |
9,262
|
|
|
|
Total |
10,868
|
|
|
|
Accumulated depreciation |
2,138
|
|
|
|
Net real estate |
$ 8,730
|
|
|
|
Year construction/ improvements |
1994
|
|
|
|
Date acquired |
Feb. 16, 2007
|
|
|
|
Tulsa, Oklahoma Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 6,917
|
|
|
|
Land, initial cost |
0
|
|
|
|
Buildings & improvements, initial cost |
14,057
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
0
|
|
|
|
Buildings & improvements, total cost |
14,057
|
|
|
|
Total |
14,057
|
|
|
|
Accumulated depreciation |
4,582
|
|
|
|
Net real estate |
$ 9,475
|
|
|
|
Year construction/ improvements |
2004
|
|
|
|
Date acquired |
Mar. 01, 2007
|
|
|
|
Hialeah, Florida Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
3,562
|
|
|
|
Buildings & improvements, initial cost |
6,672
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
769
|
|
|
|
Land, total cost |
3,562
|
|
|
|
Buildings & improvements, total cost |
7,441
|
|
|
|
Total |
11,003
|
|
|
|
Accumulated depreciation |
2,055
|
|
|
|
Net real estate |
$ 8,948
|
|
|
|
Year construction/ improvements |
1956
|
|
|
|
Year construction/improvements one |
1992
|
|
|
|
Date acquired |
Mar. 09, 2007
|
|
|
|
Tewksbury, Massachusetts Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
1,395
|
|
|
|
Buildings & improvements, initial cost |
8,893
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
(2,441)
|
|
|
|
Land, total cost |
904
|
|
|
|
Buildings & improvements, total cost |
6,943
|
|
|
|
Total |
7,847
|
|
|
|
Accumulated depreciation |
2,622
|
|
|
|
Net real estate |
$ 5,225
|
|
|
|
Year construction/ improvements |
1985
|
|
|
|
Year construction/improvements one |
1989
|
|
|
|
Date acquired |
May 17, 2007
|
|
|
|
Mason, Ohio Retail Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
1,201
|
|
|
|
Buildings & improvements, initial cost |
4,961
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
1,201
|
|
|
|
Buildings & improvements, total cost |
4,961
|
|
|
|
Total |
6,162
|
|
|
|
Accumulated depreciation |
1,359
|
|
|
|
Net real estate |
$ 4,803
|
|
|
|
Year construction/ improvements |
2007
|
|
|
|
Date acquired |
Jul. 01, 2007
|
|
|
|
Cicero, New York Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 3,459
|
|
|
|
Land, initial cost |
299
|
|
|
|
Buildings & improvements, initial cost |
5,019
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
299
|
|
|
|
Buildings & improvements, total cost |
5,019
|
|
|
|
Total |
5,318
|
|
|
|
Accumulated depreciation |
1,328
|
|
|
|
Net real estate |
$ 3,990
|
|
|
|
Year construction/ improvements |
2005
|
|
|
|
Date acquired |
Sep. 06, 2007
|
|
|
|
Grand Rapids, Michigan Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 5,393
|
|
|
|
Land, initial cost |
1,629
|
|
|
|
Buildings & improvements, initial cost |
10,500
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
308
|
|
|
|
Land, total cost |
1,629
|
|
|
|
Buildings & improvements, total cost |
10,808
|
|
|
|
Total |
12,437
|
|
|
|
Accumulated depreciation |
2,913
|
|
|
|
Net real estate |
$ 9,524
|
|
|
|
Year construction/ improvements |
2001
|
|
|
|
Date acquired |
Sep. 28, 2007
|
|
|
|
Bollingbrook, Illinois Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
1,272
|
|
|
|
Buildings & improvements, initial cost |
5,003
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
856
|
|
|
|
Land, total cost |
1,272
|
|
|
|
Buildings & improvements, total cost |
5,859
|
|
|
|
Total |
7,131
|
|
|
|
Accumulated depreciation |
1,579
|
|
|
|
Net real estate |
$ 5,552
|
|
|
|
Year construction/ improvements |
2002
|
|
|
|
Date acquired |
Sep. 28, 2007
|
|
|
|
Decatur, Georgia Medical Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
783
|
|
|
|
Buildings & improvements, initial cost |
3,241
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
783
|
|
|
|
Buildings & improvements, total cost |
3,241
|
|
|
|
Total |
4,024
|
|
|
|
Accumulated depreciation |
878
|
|
|
|
Net real estate |
$ 3,146
|
|
|
|
Year construction/ improvements |
1989
|
|
|
|
Date acquired |
Dec. 13, 2007
|
|
|
|
Decatur, Georgia Medical Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
205
|
|
|
|
Buildings & improvements, initial cost |
847
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
205
|
|
|
|
Buildings & improvements, total cost |
847
|
|
|
|
Total |
1,052
|
|
|
|
Accumulated depreciation |
230
|
|
|
|
Net real estate |
$ 822
|
|
|
|
Year construction/ improvements |
1989
|
|
|
|
Date acquired |
Dec. 13, 2007
|
|
|
|
Decatur, Georgia Medical Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
257
|
|
|
|
Buildings & improvements, initial cost |
1,062
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
257
|
|
|
|
Buildings & improvements, total cost |
1,062
|
|
|
|
Total |
1,319
|
|
|
|
Accumulated depreciation |
288
|
|
|
|
Net real estate |
$ 1,031
|
|
|
|
Year construction/ improvements |
1989
|
|
|
|
Date acquired |
Dec. 13, 2007
|
|
|
|
Lawrenceville, Georgia Medical Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
678
|
|
|
|
Buildings & improvements, initial cost |
2,807
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
678
|
|
|
|
Buildings & improvements, total cost |
2,807
|
|
|
|
Total |
3,485
|
|
|
|
Accumulated depreciation |
761
|
|
|
|
Net real estate |
$ 2,724
|
|
|
|
Year construction/ improvements |
2005
|
|
|
|
Date acquired |
Dec. 13, 2007
|
|
|
|
Snellville, Georgia Medical Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
176
|
|
|
|
Buildings & improvements, initial cost |
727
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
176
|
|
|
|
Buildings & improvements, total cost |
727
|
|
|
|
Total |
903
|
|
|
|
Accumulated depreciation |
197
|
|
|
|
Net real estate |
$ 706
|
|
|
|
Year construction/ improvements |
1986
|
|
|
|
Date acquired |
Dec. 13, 2007
|
|
|
|
Covington, Georgia Medical Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
232
|
|
|
|
Buildings & improvements, initial cost |
959
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
232
|
|
|
|
Buildings & improvements, total cost |
959
|
|
|
|
Total |
1,191
|
|
|
|
Accumulated depreciation |
260
|
|
|
|
Net real estate |
$ 931
|
|
|
|
Year construction/ improvements |
2000
|
|
|
|
Date acquired |
Dec. 13, 2007
|
|
|
|
Conyers Georgia Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
296
|
|
|
|
Buildings & improvements, initial cost |
1,228
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
296
|
|
|
|
Buildings & improvements, total cost |
1,228
|
|
|
|
Total |
1,524
|
|
|
|
Accumulated depreciation |
333
|
|
|
|
Net real estate |
$ 1,191
|
|
|
|
Year construction/ improvements |
2004
|
|
|
|
Date acquired |
Dec. 13, 2007
|
|
|
|
Cumming, Georgia Medical Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 2,908
|
|
|
|
Land, initial cost |
738
|
|
|
|
Buildings & improvements, initial cost |
3,055
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
2,524
|
|
|
|
Land, total cost |
741
|
|
|
|
Buildings & improvements, total cost |
5,576
|
|
|
|
Total |
6,317
|
|
|
|
Accumulated depreciation |
1,180
|
|
|
|
Net real estate |
$ 5,137
|
|
|
|
Year construction/ improvements |
1994
|
|
|
|
Date acquired |
Dec. 13, 2007
|
|
|
|
Reading, Pennsylvania Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 3,684
|
|
|
|
Land, initial cost |
491
|
|
|
|
Buildings & improvements, initial cost |
6,202
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
491
|
|
|
|
Buildings & improvements, total cost |
6,202
|
|
|
|
Total |
6,693
|
|
|
|
Accumulated depreciation |
1,583
|
|
|
|
Net real estate |
$ 5,110
|
|
|
|
Year construction/ improvements |
2007
|
|
|
|
Date acquired |
Jan. 29, 2008
|
|
|
|
Fridley, Minnesota Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 4,785
|
|
|
|
Land, initial cost |
1,354
|
|
|
|
Buildings & improvements, initial cost |
8,074
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
399
|
|
|
|
Land, total cost |
1,383
|
|
|
|
Buildings & improvements, total cost |
8,444
|
|
|
|
Total |
9,827
|
|
|
|
Accumulated depreciation |
2,588
|
|
|
|
Net real estate |
$ 7,239
|
|
|
|
Year construction/ improvements |
1985
|
|
|
|
Year construction/improvements one |
2006
|
|
|
|
Date acquired |
Feb. 26, 2008
|
|
|
|
Pineville, North Carolina Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 2,141
|
|
|
|
Land, initial cost |
669
|
|
|
|
Buildings & improvements, initial cost |
3,028
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
6
|
|
|
|
Land, total cost |
669
|
|
|
|
Buildings & improvements, total cost |
3,034
|
|
|
|
Total |
3,703
|
|
|
|
Accumulated depreciation |
777
|
|
|
|
Net real estate |
$ 2,926
|
|
|
|
Year construction/ improvements |
1985
|
|
|
|
Date acquired |
Apr. 30, 2008
|
|
|
|
Marietta, Ohio Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 5,226
|
|
|
|
Land, initial cost |
829
|
|
|
|
Buildings & improvements, initial cost |
6,607
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
529
|
|
|
|
Land, total cost |
829
|
|
|
|
Buildings & improvements, total cost |
7,136
|
|
|
|
Total |
7,965
|
|
|
|
Accumulated depreciation |
1,647
|
|
|
|
Net real estate |
$ 6,318
|
|
|
|
Year construction/ improvements |
1992
|
|
|
|
Year construction/improvements one |
2007
|
|
|
|
Date acquired |
Aug. 29, 2008
|
|
|
|
Chalfont, Pennsylvania Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 4,672
|
|
|
|
Land, initial cost |
1,249
|
|
|
|
Buildings & improvements, initial cost |
6,420
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
327
|
|
|
|
Land, total cost |
1,249
|
|
|
|
Buildings & improvements, total cost |
6,747
|
|
|
|
Total |
7,996
|
|
|
|
Accumulated depreciation |
1,830
|
|
|
|
Net real estate |
$ 6,166
|
|
|
|
Year construction/ improvements |
1987
|
|
|
|
Date acquired |
Aug. 29, 2008
|
|
|
|
Orange City, Iowa Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 7,365
|
|
|
|
Land, initial cost |
258
|
|
|
|
Buildings & improvements, initial cost |
5,861
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
6
|
|
|
|
Land, total cost |
258
|
|
|
|
Buildings & improvements, total cost |
5,867
|
|
|
|
Total |
6,125
|
|
|
|
Accumulated depreciation |
1,293
|
|
|
|
Net real estate |
$ 4,832
|
|
|
|
Year construction/ improvements |
1990
|
|
|
|
Date acquired |
Dec. 15, 2010
|
|
|
|
Hickory, North Carolina Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 6,257
|
|
|
|
Land, initial cost |
1,163
|
|
|
|
Buildings & improvements, initial cost |
6,605
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
1,163
|
|
|
|
Buildings & improvements, total cost |
6,605
|
|
|
|
Total |
7,768
|
|
|
|
Accumulated depreciation |
2,026
|
|
|
|
Net real estate |
$ 5,742
|
|
|
|
Year construction/ improvements |
2008
|
|
|
|
Date acquired |
Apr. 04, 2011
|
|
|
|
Springfield, Missouri Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
1,700
|
|
|
|
Buildings & improvements, initial cost |
12,038
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
1,700
|
|
|
|
Buildings & improvements, total cost |
12,038
|
|
|
|
Total |
13,738
|
|
|
|
Accumulated depreciation |
2,367
|
|
|
|
Net real estate |
$ 11,371
|
|
|
|
Year construction/ improvements |
2006
|
|
|
|
Date acquired |
Jun. 20, 2011
|
|
|
|
Boston Heights, Ohio Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 2,472
|
|
|
|
Land, initial cost |
449
|
|
|
|
Buildings & improvements, initial cost |
3,010
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
11
|
|
|
|
Land, total cost |
449
|
|
|
|
Buildings & improvements, total cost |
3,021
|
|
|
|
Total |
3,470
|
|
|
|
Accumulated depreciation |
830
|
|
|
|
Net real estate |
$ 2,640
|
|
|
|
Year construction/ improvements |
2011
|
|
|
|
Date acquired |
Oct. 20, 2011
|
|
|
|
Parsippany, New Jersey Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 6,331
|
|
|
|
Land, initial cost |
1,696
|
|
|
|
Buildings & improvements, initial cost |
7,077
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
81
|
|
|
|
Land, total cost |
1,696
|
|
|
|
Buildings & improvements, total cost |
7,158
|
|
|
|
Total |
8,854
|
|
|
|
Accumulated depreciation |
1,675
|
|
|
|
Net real estate |
$ 7,179
|
|
|
|
Year construction/ improvements |
1984
|
|
|
|
Date acquired |
Oct. 28, 2011
|
|
|
|
Dartmouth, Massachusetts Retail Location |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 3,703
|
|
|
|
Land, initial cost |
0
|
|
|
|
Buildings & improvements, initial cost |
4,236
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
0
|
|
|
|
Buildings & improvements, total cost |
4,236
|
|
|
|
Total |
4,236
|
|
|
|
Accumulated depreciation |
723
|
|
|
|
Net real estate |
$ 3,513
|
|
|
|
Year construction/ improvements |
2011
|
|
|
|
Date acquired |
Nov. 18, 2011
|
|
|
|
Springfield, Missouri Retail Location |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 1,550
|
|
|
|
Land, initial cost |
0
|
|
|
|
Buildings & improvements, initial cost |
2,275
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
0
|
|
|
|
Buildings & improvements, total cost |
2,275
|
|
|
|
Total |
2,275
|
|
|
|
Accumulated depreciation |
497
|
|
|
|
Net real estate |
$ 1,778
|
|
|
|
Year construction/ improvements |
2005
|
|
|
|
Date acquired |
Dec. 13, 2011
|
|
|
|
Pittsburgh, Pennsylvania Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 2,539
|
|
|
|
Land, initial cost |
281
|
|
|
|
Buildings & improvements, initial cost |
3,205
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
743
|
|
|
|
Land, total cost |
281
|
|
|
|
Buildings & improvements, total cost |
3,948
|
|
|
|
Total |
4,229
|
|
|
|
Accumulated depreciation |
757
|
|
|
|
Net real estate |
$ 3,472
|
|
|
|
Year construction/ improvements |
1968
|
|
|
|
Date acquired |
Dec. 28, 2011
|
|
|
|
Ashburn, Virginia Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 6,680
|
|
|
|
Land, initial cost |
706
|
|
|
|
Buildings & improvements, initial cost |
7,858
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
705
|
|
|
|
Buildings & improvements, total cost |
7,859
|
|
|
|
Total |
8,564
|
|
|
|
Accumulated depreciation |
1,549
|
|
|
|
Net real estate |
$ 7,015
|
|
|
|
Year construction/ improvements |
2002
|
|
|
|
Date acquired |
Jan. 25, 2012
|
|
|
|
Ottumwa, Iowa Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 3,650
|
|
|
|
Land, initial cost |
212
|
|
|
|
Buildings & improvements, initial cost |
5,072
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
287
|
|
|
|
Land, total cost |
212
|
|
|
|
Buildings & improvements, total cost |
5,359
|
|
|
|
Total |
5,571
|
|
|
|
Accumulated depreciation |
1,055
|
|
|
|
Net real estate |
$ 4,516
|
|
|
|
Year construction/ improvements |
1970
|
|
|
|
Date acquired |
May 30, 2012
|
|
|
|
New Albany, Ohio Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 8,078
|
|
|
|
Land, initial cost |
1,658
|
|
|
|
Buildings & improvements, initial cost |
8,746
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
1,658
|
|
|
|
Buildings & improvements, total cost |
8,746
|
|
|
|
Total |
10,404
|
|
|
|
Accumulated depreciation |
1,796
|
|
|
|
Net real estate |
$ 8,608
|
|
|
|
Year construction/ improvements |
2007
|
|
|
|
Date acquired |
Jun. 05, 2012
|
|
|
|
Columbus, Georgia Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 4,181
|
|
|
|
Land, initial cost |
1,378
|
|
|
|
Buildings & improvements, initial cost |
4,520
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
1,378
|
|
|
|
Buildings & improvements, total cost |
4,520
|
|
|
|
Total |
5,898
|
|
|
|
Accumulated depreciation |
1,031
|
|
|
|
Net real estate |
$ 4,867
|
|
|
|
Year construction/ improvements |
2012
|
|
|
|
Date acquired |
Jun. 21, 2012
|
|
|
|
Columbus, Ohio Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 2,624
|
|
|
|
Land, initial cost |
542
|
|
|
|
Buildings & improvements, initial cost |
2,453
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
92
|
|
|
|
Land, total cost |
542
|
|
|
|
Buildings & improvements, total cost |
2,545
|
|
|
|
Total |
3,087
|
|
|
|
Accumulated depreciation |
639
|
|
|
|
Net real estate |
$ 2,448
|
|
|
|
Year construction/ improvements |
1981
|
|
|
|
Date acquired |
Jun. 28, 2012
|
|
|
|
Jupiter, Florida Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 9,493
|
|
|
|
Land, initial cost |
1,160
|
|
|
|
Buildings & improvements, initial cost |
11,994
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
1,160
|
|
|
|
Buildings & improvements, total cost |
11,994
|
|
|
|
Total |
13,154
|
|
|
|
Accumulated depreciation |
1,926
|
|
|
|
Net real estate |
$ 11,228
|
|
|
|
Year construction/ improvements |
2011
|
|
|
|
Date acquired |
Sep. 26, 2012
|
|
|
|
Fort Worth, Texas Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 12,353
|
|
|
|
Land, initial cost |
963
|
|
|
|
Buildings & improvements, initial cost |
15,647
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
963
|
|
|
|
Buildings & improvements, total cost |
15,647
|
|
|
|
Total |
16,610
|
|
|
|
Accumulated depreciation |
2,452
|
|
|
|
Net real estate |
$ 14,158
|
|
|
|
Year construction/ improvements |
2005
|
|
|
|
Date acquired |
Nov. 08, 2012
|
|
|
|
Columbia, South Carolina Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 16,576
|
|
|
|
Land, initial cost |
1,905
|
|
|
|
Buildings & improvements, initial cost |
20,648
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
8
|
|
|
|
Land, total cost |
1,905
|
|
|
|
Buildings & improvements, total cost |
20,656
|
|
|
|
Total |
22,561
|
|
|
|
Accumulated depreciation |
4,521
|
|
|
|
Net real estate |
$ 18,040
|
|
|
|
Year construction/ improvements |
2010
|
|
|
|
Date acquired |
Nov. 21, 2012
|
|
|
|
Egg Harbor, New Jersey Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 3,269
|
|
|
|
Land, initial cost |
1,627
|
|
|
|
Buildings & improvements, initial cost |
3,017
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
315
|
|
|
|
Land, total cost |
1,627
|
|
|
|
Buildings & improvements, total cost |
3,332
|
|
|
|
Total |
4,959
|
|
|
|
Accumulated depreciation |
579
|
|
|
|
Net real estate |
$ 4,380
|
|
|
|
Year construction/ improvements |
1985
|
|
|
|
Date acquired |
Mar. 28, 2013
|
|
|
|
Vance, Alabama Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
457
|
|
|
|
Buildings & improvements, initial cost |
10,529
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
6,691
|
|
|
|
Land, total cost |
456
|
|
|
|
Buildings & improvements, total cost |
17,221
|
|
|
|
Total |
17,677
|
|
|
|
Accumulated depreciation |
1,822
|
|
|
|
Net real estate |
$ 15,855
|
|
|
|
Year construction/ improvements |
2013
|
|
|
|
Date acquired |
May 09, 2013
|
|
|
|
Blaine, Minnesota Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 7,646
|
|
|
|
Land, initial cost |
1,060
|
|
|
|
Buildings & improvements, initial cost |
10,518
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
1,060
|
|
|
|
Buildings & improvements, total cost |
10,518
|
|
|
|
Total |
11,578
|
|
|
|
Accumulated depreciation |
2,117
|
|
|
|
Net real estate |
$ 9,461
|
|
|
|
Year construction/ improvements |
2009
|
|
|
|
Date acquired |
May 10, 2013
|
|
|
|
Austin, Texas Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 32,834
|
|
|
|
Land, initial cost |
2,330
|
|
|
|
Buildings & improvements, initial cost |
44,021
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
122
|
|
|
|
Land, total cost |
2,330
|
|
|
|
Buildings & improvements, total cost |
44,143
|
|
|
|
Total |
46,473
|
|
|
|
Accumulated depreciation |
10,162
|
|
|
|
Net real estate |
$ 36,311
|
|
|
|
Year construction/ improvements |
1999
|
|
|
|
Date acquired |
Jul. 09, 2013
|
|
|
|
Allen, Texas Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 8,221
|
|
|
|
Land, initial cost |
2,699
|
|
|
|
Buildings & improvements, initial cost |
7,945
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
771
|
|
|
|
Land, total cost |
2,699
|
|
|
|
Buildings & improvements, total cost |
8,716
|
|
|
|
Total |
11,415
|
|
|
|
Accumulated depreciation |
1,827
|
|
|
|
Net real estate |
$ 9,588
|
|
|
|
Year construction/ improvements |
1998
|
|
|
|
Date acquired |
Jul. 10, 2013
|
|
|
|
Englewood, Colorado Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 10,577
|
|
|
|
Land, initial cost |
1,503
|
|
|
|
Buildings & improvements, initial cost |
11,739
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
1,503
|
|
|
|
Buildings & improvements, total cost |
11,739
|
|
|
|
Total |
13,242
|
|
|
|
Accumulated depreciation |
2,098
|
|
|
|
Net real estate |
$ 11,144
|
|
|
|
Year construction/ improvements |
2008
|
|
|
|
Date acquired |
Dec. 11, 2013
|
|
|
|
Novi, Michigan Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 4,018
|
|
|
|
Land, initial cost |
352
|
|
|
|
Buildings & improvements, initial cost |
5,626
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
352
|
|
|
|
Buildings & improvements, total cost |
5,626
|
|
|
|
Total |
5,978
|
|
|
|
Accumulated depreciation |
780
|
|
|
|
Net real estate |
$ 5,198
|
|
|
|
Year construction/ improvements |
1988
|
|
|
|
Date acquired |
Dec. 27, 2013
|
|
|
|
Allen, Texas Retail Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 3,040
|
|
|
|
Land, initial cost |
874
|
|
|
|
Buildings & improvements, initial cost |
3,634
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
874
|
|
|
|
Buildings & improvements, total cost |
3,634
|
|
|
|
Total |
4,508
|
|
|
|
Accumulated depreciation |
472
|
|
|
|
Net real estate |
$ 4,036
|
|
|
|
Year construction/ improvements |
2004
|
|
|
|
Date acquired |
Mar. 27, 2014
|
|
|
|
Colleyville, Texas Retail Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 2,812
|
|
|
|
Land, initial cost |
1,277
|
|
|
|
Buildings & improvements, initial cost |
2,424
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
1,277
|
|
|
|
Buildings & improvements, total cost |
2,424
|
|
|
|
Total |
3,701
|
|
|
|
Accumulated depreciation |
359
|
|
|
|
Net real estate |
$ 3,342
|
|
|
|
Year construction/ improvements |
2000
|
|
|
|
Date acquired |
Mar. 27, 2014
|
|
|
|
Rancho Cordova, California Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 4,740
|
|
|
|
Land, initial cost |
752
|
|
|
|
Buildings & improvements, initial cost |
6,176
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
287
|
|
|
|
Land, total cost |
752
|
|
|
|
Buildings & improvements, total cost |
6,463
|
|
|
|
Total |
7,215
|
|
|
|
Accumulated depreciation |
806
|
|
|
|
Net real estate |
$ 6,409
|
|
|
|
Year construction/ improvements |
1986
|
|
|
|
Date acquired |
Apr. 22, 2014
|
|
|
|
Coppell, Texas Retail Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 3,230
|
|
|
|
Land, initial cost |
1,448
|
|
|
|
Buildings & improvements, initial cost |
3,349
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
1,448
|
|
|
|
Buildings & improvements, total cost |
3,349
|
|
|
|
Total |
4,797
|
|
|
|
Accumulated depreciation |
420
|
|
|
|
Net real estate |
$ 4,377
|
|
|
|
Year construction/ improvements |
2005
|
|
|
|
Date acquired |
May 08, 2014
|
|
|
|
Columbus, Ohio (3) Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
990
|
|
|
|
Buildings & improvements, initial cost |
8,017
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
1,600
|
|
|
|
Land, total cost |
990
|
|
|
|
Buildings & improvements, total cost |
9,617
|
|
|
|
Total |
10,607
|
|
|
|
Accumulated depreciation |
1,628
|
|
|
|
Net real estate |
$ 8,979
|
|
|
|
Year construction/ improvements |
1986
|
|
|
|
Date acquired |
May 13, 2014
|
|
|
|
Taylor, Pennsylvania Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 22,045
|
|
|
|
Land, initial cost |
3,101
|
|
|
|
Buildings & improvements, initial cost |
25,405
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
3,101
|
|
|
|
Buildings & improvements, total cost |
25,405
|
|
|
|
Total |
28,506
|
|
|
|
Accumulated depreciation |
2,867
|
|
|
|
Net real estate |
$ 25,639
|
|
|
|
Year construction/ improvements |
2000
|
|
|
|
Year construction/improvements one |
2006
|
|
|
|
Date acquired |
Jun. 09, 2014
|
|
|
|
Aurora, Colorado Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
2,882
|
|
|
|
Buildings & improvements, initial cost |
3,917
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
96
|
|
|
|
Land, total cost |
2,882
|
|
|
|
Buildings & improvements, total cost |
4,013
|
|
|
|
Total |
6,895
|
|
|
|
Accumulated depreciation |
571
|
|
|
|
Net real estate |
$ 6,324
|
|
|
|
Year construction/ improvements |
1983
|
|
|
|
Date acquired |
Jul. 01, 2014
|
|
|
|
Indianapolis, Indiana Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 5,846
|
|
|
|
Land, initial cost |
502
|
|
|
|
Buildings & improvements, initial cost |
6,422
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
645
|
|
|
|
Land, total cost |
498
|
|
|
|
Buildings & improvements, total cost |
7,071
|
|
|
|
Total |
7,569
|
|
|
|
Accumulated depreciation |
1,057
|
|
|
|
Net real estate |
$ 6,512
|
|
|
|
Year construction/ improvements |
1981
|
|
|
|
Year construction/improvements one |
2014
|
|
|
|
Date acquired |
Sep. 03, 2014
|
|
|
|
Denver, Colorado Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
1,621
|
|
|
|
Buildings & improvements, initial cost |
7,071
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
243
|
|
|
|
Land, total cost |
1,621
|
|
|
|
Buildings & improvements, total cost |
7,314
|
|
|
|
Total |
8,935
|
|
|
|
Accumulated depreciation |
877
|
|
|
|
Net real estate |
$ 8,058
|
|
|
|
Year construction/ improvements |
1985
|
|
|
|
Date acquired |
Oct. 31, 2014
|
|
|
|
Monroe, Michigan Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 10,280
|
|
|
|
Land, initial cost |
658
|
|
|
|
Buildings & improvements, initial cost |
14,607
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
657
|
|
|
|
Buildings & improvements, total cost |
14,608
|
|
|
|
Total |
15,265
|
|
|
|
Accumulated depreciation |
1,378
|
|
|
|
Net real estate |
$ 13,887
|
|
|
|
Year construction/ improvements |
2004
|
|
|
|
Date acquired |
Dec. 23, 2014
|
|
|
|
Monroe, Michigan Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 7,196
|
|
|
|
Land, initial cost |
460
|
|
|
|
Buildings & improvements, initial cost |
10,225
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
460
|
|
|
|
Buildings & improvements, total cost |
10,225
|
|
|
|
Total |
10,685
|
|
|
|
Accumulated depreciation |
965
|
|
|
|
Net real estate |
$ 9,720
|
|
|
|
Year construction/ improvements |
2004
|
|
|
|
Date acquired |
Dec. 23, 2014
|
|
|
|
Richardson, Texas Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 13,873
|
|
|
|
Land, initial cost |
2,728
|
|
|
|
Buildings & improvements, initial cost |
15,372
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
66
|
|
|
|
Land, total cost |
2,728
|
|
|
|
Buildings & improvements, total cost |
15,438
|
|
|
|
Total |
18,166
|
|
|
|
Accumulated depreciation |
1,949
|
|
|
|
Net real estate |
$ 16,217
|
|
|
|
Year construction/ improvements |
1985
|
|
|
|
Year construction/improvements one |
2008
|
|
|
|
Date acquired |
Mar. 06, 2015
|
|
|
|
Birmingham, Alabama Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
650
|
|
|
|
Buildings & improvements, initial cost |
2,034
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
50
|
|
|
|
Land, total cost |
650
|
|
|
|
Buildings & improvements, total cost |
2,084
|
|
|
|
Total |
2,734
|
|
|
|
Accumulated depreciation |
274
|
|
|
|
Net real estate |
$ 2,460
|
|
|
|
Year construction/ improvements |
1982
|
|
|
|
Year construction/improvements one |
2010
|
|
|
|
Date acquired |
Mar. 20, 2015
|
|
|
|
Dublin, Ohio Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 4,192
|
|
|
|
Land, initial cost |
1,338
|
|
|
|
Buildings & improvements, initial cost |
5,058
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
35
|
|
|
|
Land, total cost |
1,338
|
|
|
|
Buildings & improvements, total cost |
5,093
|
|
|
|
Total |
6,431
|
|
|
|
Accumulated depreciation |
631
|
|
|
|
Net real estate |
$ 5,800
|
|
|
|
Year construction/ improvements |
1980
|
|
|
|
Date acquired |
May 28, 2015
|
|
|
|
Draper, Utah Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 12,666
|
|
|
|
Land, initial cost |
3,248
|
|
|
|
Buildings & improvements, initial cost |
13,129
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
74
|
|
|
|
Land, total cost |
3,248
|
|
|
|
Buildings & improvements, total cost |
13,203
|
|
|
|
Total |
16,451
|
|
|
|
Accumulated depreciation |
1,382
|
|
|
|
Net real estate |
$ 15,069
|
|
|
|
Year construction/ improvements |
2008
|
|
|
|
Date acquired |
May 29, 2015
|
|
|
|
Hapeville, Georgia Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 7,252
|
|
|
|
Land, initial cost |
2,272
|
|
|
|
Buildings & improvements, initial cost |
8,778
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
263
|
|
|
|
Land, total cost |
2,272
|
|
|
|
Buildings & improvements, total cost |
9,041
|
|
|
|
Total |
11,313
|
|
|
|
Accumulated depreciation |
834
|
|
|
|
Net real estate |
$ 10,479
|
|
|
|
Year construction/ improvements |
1999
|
|
|
|
Year construction/improvements one |
2007
|
|
|
|
Date acquired |
Jul. 15, 2015
|
|
|
|
Villa Rica, Georgia Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 3,677
|
|
|
|
Land, initial cost |
293
|
|
|
|
Buildings & improvements, initial cost |
5,277
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
18
|
|
|
|
Land, total cost |
293
|
|
|
|
Buildings & improvements, total cost |
5,295
|
|
|
|
Total |
5,588
|
|
|
|
Accumulated depreciation |
435
|
|
|
|
Net real estate |
$ 5,153
|
|
|
|
Year construction/ improvements |
2000
|
|
|
|
Year construction/improvements one |
2014
|
|
|
|
Date acquired |
Oct. 20, 2015
|
|
|
|
Taylorsville, Utah Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 9,569
|
|
|
|
Land, initial cost |
3,008
|
|
|
|
Buildings & improvements, initial cost |
10,659
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
370
|
|
|
|
Land, total cost |
3,008
|
|
|
|
Buildings & improvements, total cost |
11,029
|
|
|
|
Total |
14,037
|
|
|
|
Accumulated depreciation |
920
|
|
|
|
Net real estate |
$ 13,117
|
|
|
|
Year construction/ improvements |
1997
|
|
|
|
Date acquired |
May 26, 2016
|
|
|
|
Fort Lauderdale, Florida Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 13,721
|
|
|
|
Land, initial cost |
4,117
|
|
|
|
Buildings & improvements, initial cost |
15,516
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
1,881
|
|
|
|
Land, total cost |
4,117
|
|
|
|
Buildings & improvements, total cost |
17,397
|
|
|
|
Total |
21,514
|
|
|
|
Accumulated depreciation |
950
|
|
|
|
Net real estate |
$ 20,564
|
|
|
|
Year construction/ improvements |
1984
|
|
|
|
Date acquired |
Sep. 12, 2016
|
|
|
|
King of Prussia, Pennsylvania Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 14,800
|
|
|
|
Land, initial cost |
3,681
|
|
|
|
Buildings & improvements, initial cost |
15,739
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
3,681
|
|
|
|
Buildings & improvements, total cost |
15,739
|
|
|
|
Total |
19,420
|
|
|
|
Accumulated depreciation |
750
|
|
|
|
Net real estate |
$ 18,670
|
|
|
|
Year construction/ improvements |
2001
|
|
|
|
Date acquired |
Dec. 14, 2016
|
|
|
|
Conshohocken Pennsylvania Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 11,036
|
|
|
|
Land, initial cost |
1,996
|
|
|
|
Buildings & improvements, initial cost |
10,880
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
1,996
|
|
|
|
Buildings & improvements, total cost |
10,880
|
|
|
|
Total |
12,876
|
|
|
|
Accumulated depreciation |
228
|
|
|
|
Net real estate |
$ 12,648
|
|
|
|
Year construction/ improvements |
1996
|
|
|
|
Date acquired |
Jun. 22, 2017
|
|
|
|
Philadelphia Pennsylvania, Industrial Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 14,924
|
|
|
|
Land, initial cost |
5,896
|
|
|
|
Buildings & improvements, initial cost |
16,282
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
5,896
|
|
|
|
Buildings & improvements, total cost |
16,282
|
|
|
|
Total |
22,178
|
|
|
|
Accumulated depreciation |
371
|
|
|
|
Net real estate |
$ 21,807
|
|
|
|
Year construction/ improvements |
1994
|
|
|
|
Year construction/improvements one |
2011
|
|
|
|
Date acquired |
Jul. 07, 2017
|
|
|
|
Maitland Florida Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 11,907
|
|
|
|
Land, initial cost |
3,073
|
|
|
|
Buildings & improvements, initial cost |
19,661
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
3,073
|
|
|
|
Buildings & improvements, total cost |
19,661
|
|
|
|
Total |
22,734
|
|
|
|
Accumulated depreciation |
450
|
|
|
|
Net real estate |
$ 22,284
|
|
|
|
Year construction/ improvements |
1998
|
|
|
|
Date acquired |
Jul. 31, 2017
|
|
|
|
Maitland Florida Office Building Two |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 8,327
|
|
|
|
Land, initial cost |
2,077
|
|
|
|
Buildings & improvements, initial cost |
1,084
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
2,077
|
|
|
|
Buildings & improvements, total cost |
1,084
|
|
|
|
Total |
3,161
|
|
|
|
Accumulated depreciation |
69
|
|
|
|
Net real estate |
$ 3,092
|
|
|
|
Year construction/ improvements |
1998
|
|
|
|
Date acquired |
Jul. 31, 2017
|
|
|
|
Maitland Florida Office Building Three |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 8,327
|
|
|
|
Land, initial cost |
2,095
|
|
|
|
Buildings & improvements, initial cost |
9,339
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
2,095
|
|
|
|
Buildings & improvements, total cost |
9,339
|
|
|
|
Total |
11,434
|
|
|
|
Accumulated depreciation |
163
|
|
|
|
Net real estate |
$ 11,271
|
|
|
|
Year construction/ improvements |
1999
|
|
|
|
Date acquired |
Jul. 31, 2017
|
|
|
|
Columbus Ohio Office Building Two |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
1,926
|
|
|
|
Buildings & improvements, initial cost |
11,410
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
1,926
|
|
|
|
Buildings & improvements, total cost |
11,410
|
|
|
|
Total |
13,336
|
|
|
|
Accumulated depreciation |
48
|
|
|
|
Net real estate |
$ 13,288
|
|
|
|
Year construction/ improvements |
2007
|
|
|
|
Date acquired |
Dec. 01, 2017
|
|
|
|
Salt Lake City Office Building |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, initial cost |
$ 0
|
|
|
|
Land, initial cost |
4,446
|
|
|
|
Buildings & improvements, initial cost |
9,938
|
|
|
|
Improvement costs capitalized subsequent to acquisition |
0
|
|
|
|
Land, total cost |
4,446
|
|
|
|
Buildings & improvements, total cost |
9,938
|
|
|
|
Total |
14,384
|
|
|
|
Accumulated depreciation |
40
|
|
|
|
Net real estate |
$ 14,344
|
|
|
|
Year construction/ improvements |
2007
|
|
|
|
Date acquired |
Dec. 01, 2017
|
|
|
|