Schedule III - Real Estate and Accumulated Depreciation (Detail) - USD ($) $ in Thousands |
12 Months Ended |
|
|
|
Dec. 31, 2016 |
Dec. 31, 2015 |
Dec. 31, 2014 |
Dec. 31, 2013 |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 450,184
|
|
|
|
Land, Initial Cost |
107,301
|
|
|
|
Buildings & Improvements, Initial Cost |
679,515
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
46,387
|
|
|
|
Land, Total cost |
106,943
|
|
|
|
Buildings & Improvements, Total cost |
726,260
|
|
|
|
Total |
833,203
|
$ 782,276
|
$ 722,565
|
$ 642,353
|
Accumulated Depreciation |
134,329
|
$ 113,089
|
$ 92,133
|
$ 81,241
|
Net Real Estate |
698,874
|
|
|
|
Raleigh, North Carolina Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
4,664
|
|
|
|
Land, Initial Cost |
960
|
|
|
|
Buildings & Improvements, Initial Cost |
4,481
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
35
|
|
|
|
Land, Total cost |
960
|
|
|
|
Buildings & Improvements, Total cost |
4,516
|
|
|
|
Total |
5,476
|
|
|
|
Accumulated Depreciation |
1,983
|
|
|
|
Net Real Estate |
$ 3,493
|
|
|
|
Year Construction/ Improvements |
1997
|
|
|
|
Date Acquired |
Dec. 23, 2003
|
|
|
|
Canton, Ohio Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 1,626
|
|
|
|
Land, Initial Cost |
186
|
|
|
|
Buildings & Improvements, Initial Cost |
3,083
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
500
|
|
|
|
Land, Total cost |
187
|
|
|
|
Buildings & Improvements, Total cost |
3,582
|
|
|
|
Total |
3,769
|
|
|
|
Accumulated Depreciation |
1,207
|
|
|
|
Net Real Estate |
$ 2,562
|
|
|
|
Year Construction/ Improvements |
1994
|
|
|
|
Date Acquired |
Jan. 30, 2004
|
|
|
|
Akron, Ohio Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 0
|
|
|
|
Land, Initial Cost |
1,973
|
|
|
|
Buildings & Improvements, Initial Cost |
6,771
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
1,283
|
|
|
|
Land, Total cost |
1,974
|
|
|
|
Buildings & Improvements, Total cost |
8,053
|
|
|
|
Total |
10,027
|
|
|
|
Accumulated Depreciation |
2,342
|
|
|
|
Net Real Estate |
$ 7,685
|
|
|
|
Year Construction/ Improvements |
1968
|
|
|
|
Year Construction/Improvements One |
1999
|
|
|
|
Date Acquired |
Apr. 29, 2004
|
|
|
|
Charlotte, North Carolina Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 6,982
|
|
|
|
Land, Initial Cost |
740
|
|
|
|
Buildings & Improvements, Initial Cost |
8,423
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
61
|
|
|
|
Land, Total cost |
741
|
|
|
|
Buildings & Improvements, Total cost |
8,483
|
|
|
|
Total |
9,224
|
|
|
|
Accumulated Depreciation |
2,761
|
|
|
|
Net Real Estate |
$ 6,463
|
|
|
|
Year Construction/ Improvements |
1984
|
|
|
|
Year Construction/Improvements One |
1995
|
|
|
|
Date Acquired |
Jun. 30, 2004
|
|
|
|
Canton, North Carolina Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 3,497
|
|
|
|
Land, Initial Cost |
150
|
|
|
|
Buildings & Improvements, Initial Cost |
5,050
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
7,285
|
|
|
|
Land, Total cost |
150
|
|
|
|
Buildings & Improvements, Total cost |
12,335
|
|
|
|
Total |
12,485
|
|
|
|
Accumulated Depreciation |
2,033
|
|
|
|
Net Real Estate |
$ 10,452
|
|
|
|
Year Construction/ Improvements |
1998
|
|
|
|
Year Construction/Improvements One |
2014
|
|
|
|
Date Acquired |
Jul. 06, 2004
|
|
|
|
Crenshaw, Pennsylvania Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 0
|
|
|
|
Land, Initial Cost |
100
|
|
|
|
Buildings & Improvements, Initial Cost |
6,574
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
269
|
|
|
|
Land, Total cost |
100
|
|
|
|
Buildings & Improvements, Total cost |
6,843
|
|
|
|
Total |
6,943
|
|
|
|
Accumulated Depreciation |
2,183
|
|
|
|
Net Real Estate |
$ 4,760
|
|
|
|
Year Construction/ Improvements |
1991
|
|
|
|
Date Acquired |
Aug. 05, 2004
|
|
|
|
Lexington, North Carolina Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 0
|
|
|
|
Land, Initial Cost |
820
|
|
|
|
Buildings & Improvements, Initial Cost |
2,107
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
69
|
|
|
|
Land, Total cost |
820
|
|
|
|
Buildings & Improvements, Total cost |
2,176
|
|
|
|
Total |
2,996
|
|
|
|
Accumulated Depreciation |
715
|
|
|
|
Net Real Estate |
$ 2,281
|
|
|
|
Year Construction/ Improvements |
1986
|
|
|
|
Date Acquired |
Aug. 05, 2004
|
|
|
|
Austin, Texas Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 6,500
|
|
|
|
Land, Initial Cost |
1,000
|
|
|
|
Buildings & Improvements, Initial Cost |
6,296
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
876
|
|
|
|
Land, Total cost |
1,000
|
|
|
|
Buildings & Improvements, Total cost |
7,172
|
|
|
|
Total |
8,172
|
|
|
|
Accumulated Depreciation |
2,096
|
|
|
|
Net Real Estate |
$ 6,076
|
|
|
|
Year Construction/ Improvements |
2001
|
|
|
|
Date Acquired |
Sep. 16, 2004
|
|
|
|
Mt. Pocono, Pennsylvania Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 4,713
|
|
|
|
Land, Initial Cost |
350
|
|
|
|
Buildings & Improvements, Initial Cost |
5,819
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
18
|
|
|
|
Land, Total cost |
350
|
|
|
|
Buildings & Improvements, Total cost |
5,837
|
|
|
|
Total |
6,187
|
|
|
|
Accumulated Depreciation |
1,855
|
|
|
|
Net Real Estate |
$ 4,332
|
|
|
|
Year Construction/ Improvements |
1995
|
|
|
|
Year Construction/Improvements One |
1999
|
|
|
|
Date Acquired |
Oct. 15, 2004
|
|
|
|
San Antonio, Texas Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 0
|
|
|
|
Land, Initial Cost |
843
|
|
|
|
Buildings & Improvements, Initial Cost |
7,514
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
621
|
|
|
|
Land, Total cost |
843
|
|
|
|
Buildings & Improvements, Total cost |
8,135
|
|
|
|
Total |
8,978
|
|
|
|
Accumulated Depreciation |
2,838
|
|
|
|
Net Real Estate |
$ 6,140
|
|
|
|
Year Construction/ Improvements |
1999
|
|
|
|
Date Acquired |
Feb. 10, 2005
|
|
|
|
Big Flats, New York Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 2,677
|
|
|
|
Land, Initial Cost |
275
|
|
|
|
Buildings & Improvements, Initial Cost |
6,459
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
34
|
|
|
|
Land, Total cost |
275
|
|
|
|
Buildings & Improvements, Total cost |
6,493
|
|
|
|
Total |
6,768
|
|
|
|
Accumulated Depreciation |
1,956
|
|
|
|
Net Real Estate |
$ 4,812
|
|
|
|
Year Construction/ Improvements |
2001
|
|
|
|
Date Acquired |
Apr. 15, 2005
|
|
|
|
Wichita, Kansas Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 0
|
|
|
|
Land, Initial Cost |
1,525
|
|
|
|
Buildings & Improvements, Initial Cost |
9,703
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
327
|
|
|
|
Land, Total cost |
1,525
|
|
|
|
Buildings & Improvements, Total cost |
10,030
|
|
|
|
Total |
11,555
|
|
|
|
Accumulated Depreciation |
3,007
|
|
|
|
Net Real Estate |
$ 8,548
|
|
|
|
Year Construction/ Improvements |
2000
|
|
|
|
Date Acquired |
May 18, 2005
|
|
|
|
Arlington, Texas Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 0
|
|
|
|
Land, Initial Cost |
636
|
|
|
|
Buildings & Improvements, Initial Cost |
3,695
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
819
|
|
|
|
Land, Total cost |
636
|
|
|
|
Buildings & Improvements, Total cost |
4,514
|
|
|
|
Total |
5,150
|
|
|
|
Accumulated Depreciation |
1,249
|
|
|
|
Net Real Estate |
$ 3,901
|
|
|
|
Year Construction/ Improvements |
1966
|
|
|
|
Date Acquired |
May 26, 2005
|
|
|
|
Eatontown, New Jersey Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 3,357
|
|
|
|
Land, Initial Cost |
1,351
|
|
|
|
Buildings & Improvements, Initial Cost |
3,520
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
534
|
|
|
|
Land, Total cost |
1,351
|
|
|
|
Buildings & Improvements, Total cost |
4,054
|
|
|
|
Total |
5,405
|
|
|
|
Accumulated Depreciation |
1,241
|
|
|
|
Net Real Estate |
$ 4,164
|
|
|
|
Year Construction/ Improvements |
1991
|
|
|
|
Date Acquired |
Jul. 07, 2005
|
|
|
|
Franklin Township, New Jersey Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 6,544
|
|
|
|
Land, Initial Cost |
1,632
|
|
|
|
Buildings & Improvements, Initial Cost |
6,200
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
516
|
|
|
|
Land, Total cost |
1,632
|
|
|
|
Buildings & Improvements, Total cost |
6,716
|
|
|
|
Total |
8,348
|
|
|
|
Accumulated Depreciation |
1,809
|
|
|
|
Net Real Estate |
$ 6,539
|
|
|
|
Year Construction/ Improvements |
1978
|
|
|
|
Date Acquired |
Jul. 11, 2005
|
|
|
|
Duncan, South Carolina Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 9,560
|
|
|
|
Land, Initial Cost |
783
|
|
|
|
Buildings & Improvements, Initial Cost |
10,790
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
1,889
|
|
|
|
Land, Total cost |
783
|
|
|
|
Buildings & Improvements, Total cost |
12,679
|
|
|
|
Total |
13,462
|
|
|
|
Accumulated Depreciation |
3,615
|
|
|
|
Net Real Estate |
$ 9,847
|
|
|
|
Year Construction/ Improvements |
1984
|
|
|
|
Year Construction/Improvements One |
2001
|
|
|
|
Year Construction/Improvements Two |
2007
|
|
|
|
Date Acquired |
Jul. 14, 2005
|
|
|
|
Duncan, South Carolina Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 2,376
|
|
|
|
Land, Initial Cost |
195
|
|
|
|
Buildings & Improvements, Initial Cost |
2,682
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
470
|
|
|
|
Land, Total cost |
195
|
|
|
|
Buildings & Improvements, Total cost |
3,152
|
|
|
|
Total |
3,347
|
|
|
|
Accumulated Depreciation |
899
|
|
|
|
Net Real Estate |
$ 2,448
|
|
|
|
Year Construction/ Improvements |
1984
|
|
|
|
Year Construction/Improvements One |
2001
|
|
|
|
Year Construction/Improvements Two |
2007
|
|
|
|
Date Acquired |
Jul. 14, 2005
|
|
|
|
Hazelwood, Missouri Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 2,228
|
|
|
|
Land, Initial Cost |
763
|
|
|
|
Buildings & Improvements, Initial Cost |
2,309
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
34
|
|
|
|
Land, Total cost |
592
|
|
|
|
Buildings & Improvements, Total cost |
2,514
|
|
|
|
Total |
3,106
|
|
|
|
Accumulated Depreciation |
859
|
|
|
|
Net Real Estate |
$ 2,247
|
|
|
|
Year Construction/ Improvements |
1977
|
|
|
|
Date Acquired |
Aug. 05, 2005
|
|
|
|
Newburyport Massachusetts Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 0
|
|
|
|
Land, Initial Cost |
629
|
|
|
|
Buildings & Improvements, Initial Cost |
6,504
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
2,179
|
|
|
|
Land, Total cost |
629
|
|
|
|
Buildings & Improvements, Total cost |
8,683
|
|
|
|
Total |
9,312
|
|
|
|
Accumulated Depreciation |
2,315
|
|
|
|
Net Real Estate |
$ 6,997
|
|
|
|
Year Construction/ Improvements |
1994
|
|
|
|
Date Acquired |
Oct. 17, 2005
|
|
|
|
Clintonville, Wisconsin Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 0
|
|
|
|
Land, Initial Cost |
55
|
|
|
|
Buildings & Improvements, Initial Cost |
4,717
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
3,250
|
|
|
|
Land, Total cost |
55
|
|
|
|
Buildings & Improvements, Total cost |
7,967
|
|
|
|
Total |
8,022
|
|
|
|
Accumulated Depreciation |
1,765
|
|
|
|
Net Real Estate |
$ 6,257
|
|
|
|
Year Construction/ Improvements |
1992
|
|
|
|
Year Construction/Improvements One |
2013
|
|
|
|
Date Acquired |
Oct. 31, 2005
|
|
|
|
Maple Heights, Ohio Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 4,000
|
|
|
|
Land, Initial Cost |
1,609
|
|
|
|
Buildings & Improvements, Initial Cost |
10,065
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
1,288
|
|
|
|
Land, Total cost |
1,609
|
|
|
|
Buildings & Improvements, Total cost |
11,353
|
|
|
|
Total |
12,962
|
|
|
|
Accumulated Depreciation |
4,019
|
|
|
|
Net Real Estate |
$ 8,943
|
|
|
|
Year Construction/ Improvements |
1974
|
|
|
|
Date Acquired |
Dec. 21, 2005
|
|
|
|
Richmond, Virginia Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 5,275
|
|
|
|
Land, Initial Cost |
736
|
|
|
|
Buildings & Improvements, Initial Cost |
5,336
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
62
|
|
|
|
Land, Total cost |
736
|
|
|
|
Buildings & Improvements, Total cost |
5,398
|
|
|
|
Total |
6,134
|
|
|
|
Accumulated Depreciation |
1,560
|
|
|
|
Net Real Estate |
$ 4,574
|
|
|
|
Year Construction/ Improvements |
1972
|
|
|
|
Date Acquired |
Dec. 30, 2005
|
|
|
|
South Hadley, Massachusetts Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 0
|
|
|
|
Land, Initial Cost |
471
|
|
|
|
Buildings & Improvements, Initial Cost |
2,765
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
(984)
|
|
|
|
Land, Total cost |
270
|
|
|
|
Buildings & Improvements, Total cost |
1,982
|
|
|
|
Total |
2,252
|
|
|
|
Accumulated Depreciation |
790
|
|
|
|
Net Real Estate |
$ 1,462
|
|
|
|
Year Construction/ Improvements |
1978
|
|
|
|
Date Acquired |
Feb. 15, 2006
|
|
|
|
Champaign, Illinois Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 1,542
|
|
|
|
Land, Initial Cost |
687
|
|
|
|
Buildings & Improvements, Initial Cost |
2,036
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
2
|
|
|
|
Land, Total cost |
687
|
|
|
|
Buildings & Improvements, Total cost |
2,038
|
|
|
|
Total |
2,725
|
|
|
|
Accumulated Depreciation |
598
|
|
|
|
Net Real Estate |
$ 2,127
|
|
|
|
Year Construction/ Improvements |
1996
|
|
|
|
Date Acquired |
Feb. 21, 2006
|
|
|
|
Champaign, Illinois Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 3,024
|
|
|
|
Land, Initial Cost |
1,347
|
|
|
|
Buildings & Improvements, Initial Cost |
3,992
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
4
|
|
|
|
Land, Total cost |
1,347
|
|
|
|
Buildings & Improvements, Total cost |
3,996
|
|
|
|
Total |
5,343
|
|
|
|
Accumulated Depreciation |
1,172
|
|
|
|
Net Real Estate |
$ 4,171
|
|
|
|
Year Construction/ Improvements |
1996
|
|
|
|
Date Acquired |
Feb. 21, 2006
|
|
|
|
Champaign, Illinois Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 1,890
|
|
|
|
Land, Initial Cost |
842
|
|
|
|
Buildings & Improvements, Initial Cost |
2,495
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
2
|
|
|
|
Land, Total cost |
842
|
|
|
|
Buildings & Improvements, Total cost |
2,497
|
|
|
|
Total |
3,339
|
|
|
|
Accumulated Depreciation |
732
|
|
|
|
Net Real Estate |
$ 2,607
|
|
|
|
Year Construction/ Improvements |
1996
|
|
|
|
Date Acquired |
Feb. 21, 2006
|
|
|
|
Champaign, Illinois Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 1,728
|
|
|
|
Land, Initial Cost |
770
|
|
|
|
Buildings & Improvements, Initial Cost |
2,281
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
2
|
|
|
|
Land, Total cost |
770
|
|
|
|
Buildings & Improvements, Total cost |
2,283
|
|
|
|
Total |
3,053
|
|
|
|
Accumulated Depreciation |
669
|
|
|
|
Net Real Estate |
$ 2,384
|
|
|
|
Year Construction/ Improvements |
1996
|
|
|
|
Date Acquired |
Feb. 21, 2006
|
|
|
|
Burnsville, Minnesota Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 7,900
|
|
|
|
Land, Initial Cost |
3,511
|
|
|
|
Buildings & Improvements, Initial Cost |
8,746
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
6,409
|
|
|
|
Land, Total cost |
3,511
|
|
|
|
Buildings & Improvements, Total cost |
15,155
|
|
|
|
Total |
18,666
|
|
|
|
Accumulated Depreciation |
3,495
|
|
|
|
Net Real Estate |
$ 15,171
|
|
|
|
Year Construction/ Improvements |
1984
|
|
|
|
Date Acquired |
May 10, 2006
|
|
|
|
Menomonee Falls, Wisconsin Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 6,552
|
|
|
|
Land, Initial Cost |
625
|
|
|
|
Buildings & Improvements, Initial Cost |
6,911
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
686
|
|
|
|
Land, Total cost |
625
|
|
|
|
Buildings & Improvements, Total cost |
7,597
|
|
|
|
Total |
8,222
|
|
|
|
Accumulated Depreciation |
1,923
|
|
|
|
Net Real Estate |
$ 6,299
|
|
|
|
Year Construction/ Improvements |
1986
|
|
|
|
Year Construction/Improvements One |
2000
|
|
|
|
Date Acquired |
Jun. 30, 2006
|
|
|
|
Baytown, Texas Medical Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 2,000
|
|
|
|
Land, Initial Cost |
221
|
|
|
|
Buildings & Improvements, Initial Cost |
2,443
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
1,916
|
|
|
|
Land, Total cost |
221
|
|
|
|
Buildings & Improvements, Total cost |
4,359
|
|
|
|
Total |
4,580
|
|
|
|
Accumulated Depreciation |
791
|
|
|
|
Net Real Estate |
$ 3,789
|
|
|
|
Year Construction/ Improvements |
1997
|
|
|
|
Date Acquired |
Jul. 11, 2006
|
|
|
|
Mason, Ohio Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 4,042
|
|
|
|
Land, Initial Cost |
797
|
|
|
|
Buildings & Improvements, Initial Cost |
6,258
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
540
|
|
|
|
Land, Total cost |
797
|
|
|
|
Buildings & Improvements, Total cost |
6,798
|
|
|
|
Total |
7,595
|
|
|
|
Accumulated Depreciation |
1,971
|
|
|
|
Net Real Estate |
$ 5,624
|
|
|
|
Year Construction/ Improvements |
2002
|
|
|
|
Date Acquired |
Jan. 05, 2007
|
|
|
|
Raleigh, North Carolina Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 4,978
|
|
|
|
Land, Initial Cost |
1,606
|
|
|
|
Buildings & Improvements, Initial Cost |
5,513
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
3,725
|
|
|
|
Land, Total cost |
1,606
|
|
|
|
Buildings & Improvements, Total cost |
9,238
|
|
|
|
Total |
10,844
|
|
|
|
Accumulated Depreciation |
1,658
|
|
|
|
Net Real Estate |
$ 9,186
|
|
|
|
Year Construction/ Improvements |
1994
|
|
|
|
Date Acquired |
Feb. 16, 2007
|
|
|
|
Tulsa, Oklahoma Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 7,220
|
|
|
|
Land, Initial Cost |
0
|
|
|
|
Buildings & Improvements, Initial Cost |
14,057
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
0
|
|
|
|
Buildings & Improvements, Total cost |
14,057
|
|
|
|
Total |
14,057
|
|
|
|
Accumulated Depreciation |
4,158
|
|
|
|
Net Real Estate |
$ 9,899
|
|
|
|
Year Construction/ Improvements |
2004
|
|
|
|
Date Acquired |
Mar. 01, 2007
|
|
|
|
Hialeah, Florida Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 0
|
|
|
|
Land, Initial Cost |
3,562
|
|
|
|
Buildings & Improvements, Initial Cost |
6,672
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
713
|
|
|
|
Land, Total cost |
3,562
|
|
|
|
Buildings & Improvements, Total cost |
7,385
|
|
|
|
Total |
10,947
|
|
|
|
Accumulated Depreciation |
1,841
|
|
|
|
Net Real Estate |
$ 9,106
|
|
|
|
Year Construction/ Improvements |
1956
|
|
|
|
Year Construction/Improvements One |
1992
|
|
|
|
Date Acquired |
Mar. 09, 2007
|
|
|
|
Tewksbury, Massachusetts Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 0
|
|
|
|
Land, Initial Cost |
1,395
|
|
|
|
Buildings & Improvements, Initial Cost |
8,893
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
52
|
|
|
|
Land, Total cost |
1,395
|
|
|
|
Buildings & Improvements, Total cost |
8,945
|
|
|
|
Total |
10,340
|
|
|
|
Accumulated Depreciation |
2,381
|
|
|
|
Net Real Estate |
$ 7,959
|
|
|
|
Year Construction/ Improvements |
1985
|
|
|
|
Year Construction/Improvements One |
1989
|
|
|
|
Date Acquired |
May 17, 2007
|
|
|
|
Mason, Ohio Retail Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 4,391
|
|
|
|
Land, Initial Cost |
1,201
|
|
|
|
Buildings & Improvements, Initial Cost |
4,961
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
1,201
|
|
|
|
Buildings & Improvements, Total cost |
4,961
|
|
|
|
Total |
6,162
|
|
|
|
Accumulated Depreciation |
1,229
|
|
|
|
Net Real Estate |
$ 4,933
|
|
|
|
Year Construction/ Improvements |
2007
|
|
|
|
Date Acquired |
Jul. 01, 2007
|
|
|
|
Cicero, New York Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 3,551
|
|
|
|
Land, Initial Cost |
299
|
|
|
|
Buildings & Improvements, Initial Cost |
5,019
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
299
|
|
|
|
Buildings & Improvements, Total cost |
5,019
|
|
|
|
Total |
5,318
|
|
|
|
Accumulated Depreciation |
1,199
|
|
|
|
Net Real Estate |
$ 4,119
|
|
|
|
Year Construction/ Improvements |
2005
|
|
|
|
Date Acquired |
Sep. 06, 2007
|
|
|
|
Grand Rapids, Michigan Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 5,547
|
|
|
|
Land, Initial Cost |
1,629
|
|
|
|
Buildings & Improvements, Initial Cost |
10,500
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
308
|
|
|
|
Land, Total cost |
1,629
|
|
|
|
Buildings & Improvements, Total cost |
10,808
|
|
|
|
Total |
12,437
|
|
|
|
Accumulated Depreciation |
2,611
|
|
|
|
Net Real Estate |
$ 9,826
|
|
|
|
Year Construction/ Improvements |
2001
|
|
|
|
Date Acquired |
Sep. 28, 2007
|
|
|
|
Bollingbrook, Illinois Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 0
|
|
|
|
Land, Initial Cost |
1,272
|
|
|
|
Buildings & Improvements, Initial Cost |
5,003
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
846
|
|
|
|
Land, Total cost |
1,272
|
|
|
|
Buildings & Improvements, Total cost |
5,849
|
|
|
|
Total |
7,121
|
|
|
|
Accumulated Depreciation |
1,348
|
|
|
|
Net Real Estate |
$ 5,773
|
|
|
|
Year Construction/ Improvements |
2002
|
|
|
|
Date Acquired |
Sep. 28, 2007
|
|
|
|
Decatur, Georgia Medical Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 696
|
|
|
|
Land, Initial Cost |
784
|
|
|
|
Buildings & Improvements, Initial Cost |
3,245
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
585
|
|
|
|
Land, Total cost |
784
|
|
|
|
Buildings & Improvements, Total cost |
3,830
|
|
|
|
Total |
4,614
|
|
|
|
Accumulated Depreciation |
858
|
|
|
|
Net Real Estate |
$ 3,756
|
|
|
|
Year Construction/ Improvements |
1989
|
|
|
|
Date Acquired |
Dec. 13, 2007
|
|
|
|
Decatur, Georgia Medical Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 182
|
|
|
|
Land, Initial Cost |
205
|
|
|
|
Buildings & Improvements, Initial Cost |
848
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
153
|
|
|
|
Land, Total cost |
205
|
|
|
|
Buildings & Improvements, Total cost |
1,001
|
|
|
|
Total |
1,206
|
|
|
|
Accumulated Depreciation |
224
|
|
|
|
Net Real Estate |
$ 982
|
|
|
|
Year Construction/ Improvements |
1989
|
|
|
|
Date Acquired |
Dec. 13, 2007
|
|
|
|
Decatur, Georgia Medical Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 228
|
|
|
|
Land, Initial Cost |
257
|
|
|
|
Buildings & Improvements, Initial Cost |
1,064
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
192
|
|
|
|
Land, Total cost |
257
|
|
|
|
Buildings & Improvements, Total cost |
1,256
|
|
|
|
Total |
1,513
|
|
|
|
Accumulated Depreciation |
281
|
|
|
|
Net Real Estate |
$ 1,232
|
|
|
|
Year Construction/ Improvements |
1989
|
|
|
|
Date Acquired |
Dec. 13, 2007
|
|
|
|
Lawrenceville, Georgia Medical Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 603
|
|
|
|
Land, Initial Cost |
679
|
|
|
|
Buildings & Improvements, Initial Cost |
2,809
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
506
|
|
|
|
Land, Total cost |
679
|
|
|
|
Buildings & Improvements, Total cost |
3,315
|
|
|
|
Total |
3,994
|
|
|
|
Accumulated Depreciation |
743
|
|
|
|
Net Real Estate |
$ 3,251
|
|
|
|
Year Construction/ Improvements |
2005
|
|
|
|
Date Acquired |
Dec. 13, 2007
|
|
|
|
Snellville, Georgia Medical Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 156
|
|
|
|
Land, Initial Cost |
176
|
|
|
|
Buildings & Improvements, Initial Cost |
729
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
131
|
|
|
|
Land, Total cost |
176
|
|
|
|
Buildings & Improvements, Total cost |
860
|
|
|
|
Total |
1,036
|
|
|
|
Accumulated Depreciation |
193
|
|
|
|
Net Real Estate |
$ 843
|
|
|
|
Year Construction/ Improvements |
1986
|
|
|
|
Date Acquired |
Dec. 13, 2007
|
|
|
|
Covington, Georgia Medical Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 206
|
|
|
|
Land, Initial Cost |
232
|
|
|
|
Buildings & Improvements, Initial Cost |
959
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
173
|
|
|
|
Land, Total cost |
232
|
|
|
|
Buildings & Improvements, Total cost |
1,132
|
|
|
|
Total |
1,364
|
|
|
|
Accumulated Depreciation |
254
|
|
|
|
Net Real Estate |
$ 1,110
|
|
|
|
Year Construction/ Improvements |
2000
|
|
|
|
Date Acquired |
Dec. 13, 2007
|
|
|
|
Cumming, Georgia Medical Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 656
|
|
|
|
Land, Initial Cost |
738
|
|
|
|
Buildings & Improvements, Initial Cost |
3,055
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
550
|
|
|
|
Land, Total cost |
738
|
|
|
|
Buildings & Improvements, Total cost |
3,605
|
|
|
|
Total |
4,343
|
|
|
|
Accumulated Depreciation |
808
|
|
|
|
Net Real Estate |
$ 3,535
|
|
|
|
Year Construction/ Improvements |
2004
|
|
|
|
Date Acquired |
Dec. 13, 2007
|
|
|
|
Conyers, Georgia Medical Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 264
|
|
|
|
Land, Initial Cost |
297
|
|
|
|
Buildings & Improvements, Initial Cost |
1,228
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
221
|
|
|
|
Land, Total cost |
297
|
|
|
|
Buildings & Improvements, Total cost |
1,449
|
|
|
|
Total |
1,746
|
|
|
|
Accumulated Depreciation |
325
|
|
|
|
Net Real Estate |
$ 1,421
|
|
|
|
Year Construction/ Improvements |
1994
|
|
|
|
Date Acquired |
Dec. 13, 2007
|
|
|
|
Reading, Pennsylvania Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 3,789
|
|
|
|
Land, Initial Cost |
491
|
|
|
|
Buildings & Improvements, Initial Cost |
6,202
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
491
|
|
|
|
Buildings & Improvements, Total cost |
6,202
|
|
|
|
Total |
6,693
|
|
|
|
Accumulated Depreciation |
1,423
|
|
|
|
Net Real Estate |
$ 5,270
|
|
|
|
Year Construction/ Improvements |
2007
|
|
|
|
Date Acquired |
Jan. 29, 2008
|
|
|
|
Fridley, Minnesota Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 4,904
|
|
|
|
Land, Initial Cost |
1,354
|
|
|
|
Buildings & Improvements, Initial Cost |
8,074
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
399
|
|
|
|
Land, Total cost |
1,383
|
|
|
|
Buildings & Improvements, Total cost |
8,444
|
|
|
|
Total |
9,827
|
|
|
|
Accumulated Depreciation |
2,330
|
|
|
|
Net Real Estate |
$ 7,497
|
|
|
|
Year Construction/ Improvements |
1985
|
|
|
|
Year Construction/Improvements One |
2006
|
|
|
|
Date Acquired |
Feb. 26, 2008
|
|
|
|
Concord Township, Ohio Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 0
|
|
|
|
Land, Initial Cost |
1,796
|
|
|
|
Buildings & Improvements, Initial Cost |
11,154
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
(10)
|
|
|
|
Land, Total cost |
1,786
|
|
|
|
Buildings & Improvements, Total cost |
11,154
|
|
|
|
Total |
12,940
|
|
|
|
Accumulated Depreciation |
2,658
|
|
|
|
Net Real Estate |
$ 10,282
|
|
|
|
Year Construction/ Improvements |
1957
|
|
|
|
Year Construction/Improvements One |
2008
|
|
|
|
Date Acquired |
Mar. 31, 2008
|
|
|
|
Pineville, North Carolina Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 2,202
|
|
|
|
Land, Initial Cost |
669
|
|
|
|
Buildings & Improvements, Initial Cost |
3,028
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
6
|
|
|
|
Land, Total cost |
669
|
|
|
|
Buildings & Improvements, Total cost |
3,034
|
|
|
|
Total |
3,703
|
|
|
|
Accumulated Depreciation |
696
|
|
|
|
Net Real Estate |
$ 3,007
|
|
|
|
Year Construction/ Improvements |
1985
|
|
|
|
Date Acquired |
Apr. 30, 2008
|
|
|
|
Marietta, Ohio Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 5,375
|
|
|
|
Land, Initial Cost |
829
|
|
|
|
Buildings & Improvements, Initial Cost |
6,607
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
209
|
|
|
|
Land, Total cost |
829
|
|
|
|
Buildings & Improvements, Total cost |
6,816
|
|
|
|
Total |
7,645
|
|
|
|
Accumulated Depreciation |
1,460
|
|
|
|
Net Real Estate |
$ 6,185
|
|
|
|
Year Construction/ Improvements |
1992
|
|
|
|
Year Construction/Improvements One |
2007
|
|
|
|
Date Acquired |
Aug. 29, 2008
|
|
|
|
Chalfont, Pennsylvania Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 5,577
|
|
|
|
Land, Initial Cost |
1,249
|
|
|
|
Buildings & Improvements, Initial Cost |
6,420
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
327
|
|
|
|
Land, Total cost |
1,249
|
|
|
|
Buildings & Improvements, Total cost |
6,747
|
|
|
|
Total |
7,996
|
|
|
|
Accumulated Depreciation |
1,653
|
|
|
|
Net Real Estate |
$ 6,343
|
|
|
|
Year Construction/ Improvements |
1987
|
|
|
|
Date Acquired |
Aug. 29, 2008
|
|
|
|
Orange City, Iowa Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 7,951
|
|
|
|
Land, Initial Cost |
258
|
|
|
|
Buildings & Improvements, Initial Cost |
5,861
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
6
|
|
|
|
Land, Total cost |
258
|
|
|
|
Buildings & Improvements, Total cost |
5,867
|
|
|
|
Total |
6,125
|
|
|
|
Accumulated Depreciation |
1,109
|
|
|
|
Net Real Estate |
$ 5,016
|
|
|
|
Year Construction/ Improvements |
1990
|
|
|
|
Date Acquired |
Dec. 15, 2010
|
|
|
|
Hickory, North Carolina Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 6,413
|
|
|
|
Land, Initial Cost |
1,163
|
|
|
|
Buildings & Improvements, Initial Cost |
6,605
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
1,163
|
|
|
|
Buildings & Improvements, Total cost |
6,605
|
|
|
|
Total |
7,768
|
|
|
|
Accumulated Depreciation |
1,725
|
|
|
|
Net Real Estate |
$ 6,043
|
|
|
|
Year Construction/ Improvements |
2008
|
|
|
|
Date Acquired |
Apr. 04, 2011
|
|
|
|
Springfield, Missouri Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 0
|
|
|
|
Land, Initial Cost |
1,700
|
|
|
|
Buildings & Improvements, Initial Cost |
12,038
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
1,700
|
|
|
|
Buildings & Improvements, Total cost |
12,038
|
|
|
|
Total |
13,738
|
|
|
|
Accumulated Depreciation |
2,004
|
|
|
|
Net Real Estate |
$ 11,734
|
|
|
|
Year Construction/ Improvements |
2006
|
|
|
|
Date Acquired |
Jun. 20, 2011
|
|
|
|
Boston Heights, Ohio Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 2,534
|
|
|
|
Land, Initial Cost |
449
|
|
|
|
Buildings & Improvements, Initial Cost |
3,010
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
449
|
|
|
|
Buildings & Improvements, Total cost |
3,010
|
|
|
|
Total |
3,459
|
|
|
|
Accumulated Depreciation |
696
|
|
|
|
Net Real Estate |
$ 2,763
|
|
|
|
Year Construction/ Improvements |
2011
|
|
|
|
Date Acquired |
Oct. 20, 2011
|
|
|
|
Parsippany, New Jersey Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 6,497
|
|
|
|
Land, Initial Cost |
1,696
|
|
|
|
Buildings & Improvements, Initial Cost |
7,077
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
81
|
|
|
|
Land, Total cost |
1,696
|
|
|
|
Buildings & Improvements, Total cost |
7,158
|
|
|
|
Total |
8,854
|
|
|
|
Accumulated Depreciation |
1,401
|
|
|
|
Net Real Estate |
$ 7,453
|
|
|
|
Year Construction/ Improvements |
1984
|
|
|
|
Date Acquired |
Oct. 28, 2011
|
|
|
|
Dartmouth, Massachusetts Retail Location [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 3,824
|
|
|
|
Land, Initial Cost |
0
|
|
|
|
Buildings & Improvements, Initial Cost |
4,236
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
0
|
|
|
|
Buildings & Improvements, Total cost |
4,236
|
|
|
|
Total |
4,236
|
|
|
|
Accumulated Depreciation |
605
|
|
|
|
Net Real Estate |
$ 3,631
|
|
|
|
Year Construction/ Improvements |
2011
|
|
|
|
Date Acquired |
Nov. 18, 2011
|
|
|
|
Springfield, Missouri Retail Location [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 1,646
|
|
|
|
Land, Initial Cost |
0
|
|
|
|
Buildings & Improvements, Initial Cost |
2,275
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
0
|
|
|
|
Buildings & Improvements, Total cost |
2,275
|
|
|
|
Total |
2,275
|
|
|
|
Accumulated Depreciation |
415
|
|
|
|
Net Real Estate |
$ 1,860
|
|
|
|
Year Construction/ Improvements |
2005
|
|
|
|
Date Acquired |
Dec. 13, 2011
|
|
|
|
Pittsburgh, Pennsylvania Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 2,605
|
|
|
|
Land, Initial Cost |
281
|
|
|
|
Buildings & Improvements, Initial Cost |
3,205
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
743
|
|
|
|
Land, Total cost |
281
|
|
|
|
Buildings & Improvements, Total cost |
3,948
|
|
|
|
Total |
4,229
|
|
|
|
Accumulated Depreciation |
586
|
|
|
|
Net Real Estate |
$ 3,643
|
|
|
|
Year Construction/ Improvements |
1968
|
|
|
|
Date Acquired |
Dec. 28, 2011
|
|
|
|
Ashburn, Virginia Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 6,870
|
|
|
|
Land, Initial Cost |
706
|
|
|
|
Buildings & Improvements, Initial Cost |
7,858
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
705
|
|
|
|
Buildings & Improvements, Total cost |
7,859
|
|
|
|
Total |
8,564
|
|
|
|
Accumulated Depreciation |
1,293
|
|
|
|
Net Real Estate |
$ 7,271
|
|
|
|
Year Construction/ Improvements |
2002
|
|
|
|
Date Acquired |
Jan. 25, 2012
|
|
|
|
Ottumwa, Iowa Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 3,926
|
|
|
|
Land, Initial Cost |
212
|
|
|
|
Buildings & Improvements, Initial Cost |
5,072
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
287
|
|
|
|
Land, Total cost |
212
|
|
|
|
Buildings & Improvements, Total cost |
5,359
|
|
|
|
Total |
5,571
|
|
|
|
Accumulated Depreciation |
886
|
|
|
|
Net Real Estate |
$ 4,685
|
|
|
|
Year Construction/ Improvements |
1970
|
|
|
|
Date Acquired |
May 30, 2012
|
|
|
|
New Albany, Ohio Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 8,426
|
|
|
|
Land, Initial Cost |
1,658
|
|
|
|
Buildings & Improvements, Initial Cost |
8,746
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
1,658
|
|
|
|
Buildings & Improvements, Total cost |
8,746
|
|
|
|
Total |
10,404
|
|
|
|
Accumulated Depreciation |
1,474
|
|
|
|
Net Real Estate |
$ 8,930
|
|
|
|
Year Construction/ Improvements |
2007
|
|
|
|
Date Acquired |
Jun. 05, 2012
|
|
|
|
Columbus, Georgia Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 4,298
|
|
|
|
Land, Initial Cost |
1,378
|
|
|
|
Buildings & Improvements, Initial Cost |
4,520
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
1,378
|
|
|
|
Buildings & Improvements, Total cost |
4,520
|
|
|
|
Total |
5,898
|
|
|
|
Accumulated Depreciation |
844
|
|
|
|
Net Real Estate |
$ 5,054
|
|
|
|
Year Construction/ Improvements |
2012
|
|
|
|
Date Acquired |
Jun. 21, 2012
|
|
|
|
Columbus, Ohio Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 2,702
|
|
|
|
Land, Initial Cost |
542
|
|
|
|
Buildings & Improvements, Initial Cost |
2,453
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
92
|
|
|
|
Land, Total cost |
542
|
|
|
|
Buildings & Improvements, Total cost |
2,545
|
|
|
|
Total |
3,087
|
|
|
|
Accumulated Depreciation |
521
|
|
|
|
Net Real Estate |
$ 2,566
|
|
|
|
Year Construction/ Improvements |
1981
|
|
|
|
Date Acquired |
Jun. 28, 2012
|
|
|
|
Jupiter, Florida Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 9,761
|
|
|
|
Land, Initial Cost |
1,160
|
|
|
|
Buildings & Improvements, Initial Cost |
11,994
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
1,160
|
|
|
|
Buildings & Improvements, Total cost |
11,994
|
|
|
|
Total |
13,154
|
|
|
|
Accumulated Depreciation |
1,559
|
|
|
|
Net Real Estate |
$ 11,595
|
|
|
|
Year Construction/ Improvements |
2011
|
|
|
|
Date Acquired |
Sep. 26, 2012
|
|
|
|
Fort Worth, Texas Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 12,920
|
|
|
|
Land, Initial Cost |
963
|
|
|
|
Buildings & Improvements, Initial Cost |
15,647
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
963
|
|
|
|
Buildings & Improvements, Total cost |
15,647
|
|
|
|
Total |
16,610
|
|
|
|
Accumulated Depreciation |
1,975
|
|
|
|
Net Real Estate |
$ 14,635
|
|
|
|
Year Construction/ Improvements |
2005
|
|
|
|
Date Acquired |
Nov. 08, 2012
|
|
|
|
Columbia, South Carolina Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 17,094
|
|
|
|
Land, Initial Cost |
1,905
|
|
|
|
Buildings & Improvements, Initial Cost |
20,648
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
8
|
|
|
|
Land, Total cost |
1,905
|
|
|
|
Buildings & Improvements, Total cost |
20,656
|
|
|
|
Total |
22,561
|
|
|
|
Accumulated Depreciation |
3,634
|
|
|
|
Net Real Estate |
$ 18,927
|
|
|
|
Year Construction/ Improvements |
2010
|
|
|
|
Date Acquired |
Nov. 21, 2012
|
|
|
|
Egg Harbor, New Jersey Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 3,367
|
|
|
|
Land, Initial Cost |
1,627
|
|
|
|
Buildings & Improvements, Initial Cost |
3,017
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
315
|
|
|
|
Land, Total cost |
1,627
|
|
|
|
Buildings & Improvements, Total cost |
3,332
|
|
|
|
Total |
4,959
|
|
|
|
Accumulated Depreciation |
451
|
|
|
|
Net Real Estate |
$ 4,508
|
|
|
|
Year Construction/ Improvements |
1985
|
|
|
|
Date Acquired |
Mar. 28, 2013
|
|
|
|
Vance, Alabama Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 0
|
|
|
|
Land, Initial Cost |
457
|
|
|
|
Buildings & Improvements, Initial Cost |
10,529
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
2,534
|
|
|
|
Land, Total cost |
456
|
|
|
|
Buildings & Improvements, Total cost |
13,064
|
|
|
|
Total |
13,520
|
|
|
|
Accumulated Depreciation |
1,339
|
|
|
|
Net Real Estate |
$ 12,181
|
|
|
|
Year Construction/ Improvements |
2013
|
|
|
|
Date Acquired |
May 09, 2013
|
|
|
|
Blaine, Minnesota Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 7,783
|
|
|
|
Land, Initial Cost |
1,060
|
|
|
|
Buildings & Improvements, Initial Cost |
10,519
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
1,060
|
|
|
|
Buildings & Improvements, Total cost |
10,519
|
|
|
|
Total |
11,579
|
|
|
|
Accumulated Depreciation |
1,661
|
|
|
|
Net Real Estate |
$ 9,918
|
|
|
|
Year Construction/ Improvements |
2009
|
|
|
|
Date Acquired |
May 10, 2013
|
|
|
|
Austin, Texas Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 33,442
|
|
|
|
Land, Initial Cost |
2,330
|
|
|
|
Buildings & Improvements, Initial Cost |
44,021
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
122
|
|
|
|
Land, Total cost |
2,330
|
|
|
|
Buildings & Improvements, Total cost |
44,143
|
|
|
|
Total |
46,473
|
|
|
|
Accumulated Depreciation |
7,797
|
|
|
|
Net Real Estate |
$ 38,676
|
|
|
|
Year Construction/ Improvements |
1999
|
|
|
|
Date Acquired |
Jul. 09, 2013
|
|
|
|
Allen, Texas Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 8,389
|
|
|
|
Land, Initial Cost |
2,699
|
|
|
|
Buildings & Improvements, Initial Cost |
7,945
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
2,699
|
|
|
|
Buildings & Improvements, Total cost |
7,945
|
|
|
|
Total |
10,644
|
|
|
|
Accumulated Depreciation |
1,418
|
|
|
|
Net Real Estate |
$ 9,226
|
|
|
|
Year Construction/ Improvements |
1998
|
|
|
|
Date Acquired |
Jul. 10, 2013
|
|
|
|
Englewood, Colorado Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 10,835
|
|
|
|
Land, Initial Cost |
1,503
|
|
|
|
Buildings & Improvements, Initial Cost |
11,739
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
1,503
|
|
|
|
Buildings & Improvements, Total cost |
11,739
|
|
|
|
Total |
13,242
|
|
|
|
Accumulated Depreciation |
1,580
|
|
|
|
Net Real Estate |
$ 11,662
|
|
|
|
Year Construction/ Improvements |
2008
|
|
|
|
Date Acquired |
Dec. 11, 2013
|
|
|
|
Novi, Michigan Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 4,116
|
|
|
|
Land, Initial Cost |
352
|
|
|
|
Buildings & Improvements, Initial Cost |
5,626
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
352
|
|
|
|
Buildings & Improvements, Total cost |
5,626
|
|
|
|
Total |
5,978
|
|
|
|
Accumulated Depreciation |
585
|
|
|
|
Net Real Estate |
$ 5,393
|
|
|
|
Year Construction/ Improvements |
1988
|
|
|
|
Date Acquired |
Dec. 27, 2013
|
|
|
|
Allen, Texas Retail Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 3,138
|
|
|
|
Land, Initial Cost |
874
|
|
|
|
Buildings & Improvements, Initial Cost |
3,634
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
874
|
|
|
|
Buildings & Improvements, Total cost |
3,634
|
|
|
|
Total |
4,508
|
|
|
|
Accumulated Depreciation |
346
|
|
|
|
Net Real Estate |
$ 4,162
|
|
|
|
Year Construction/ Improvements |
2004
|
|
|
|
Date Acquired |
Mar. 27, 2014
|
|
|
|
Colleyville, Texas Retail Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 2,902
|
|
|
|
Land, Initial Cost |
1,277
|
|
|
|
Buildings & Improvements, Initial Cost |
2,424
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
1,277
|
|
|
|
Buildings & Improvements, Total cost |
2,424
|
|
|
|
Total |
3,701
|
|
|
|
Accumulated Depreciation |
263
|
|
|
|
Net Real Estate |
$ 3,438
|
|
|
|
Year Construction/ Improvements |
2000
|
|
|
|
Date Acquired |
Mar. 27, 2014
|
|
|
|
Rancho Cordova, California Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 4,817
|
|
|
|
Land, Initial Cost |
752
|
|
|
|
Buildings & Improvements, Initial Cost |
6,176
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
44
|
|
|
|
Land, Total cost |
752
|
|
|
|
Buildings & Improvements, Total cost |
6,220
|
|
|
|
Total |
6,972
|
|
|
|
Accumulated Depreciation |
586
|
|
|
|
Net Real Estate |
$ 6,386
|
|
|
|
Year Construction/ Improvements |
1986
|
|
|
|
Date Acquired |
Apr. 22, 2014
|
|
|
|
Coppell, Texas Retail Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 3,334
|
|
|
|
Land, Initial Cost |
1,448
|
|
|
|
Buildings & Improvements, Initial Cost |
3,349
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
1,448
|
|
|
|
Buildings & Improvements, Total cost |
3,349
|
|
|
|
Total |
4,797
|
|
|
|
Accumulated Depreciation |
304
|
|
|
|
Net Real Estate |
$ 4,493
|
|
|
|
Year Construction/ Improvements |
2005
|
|
|
|
Date Acquired |
May 08, 2014
|
|
|
|
Columbus, Ohio (3) Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 0
|
|
|
|
Land, Initial Cost |
990
|
|
|
|
Buildings & Improvements, Initial Cost |
8,017
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
1,309
|
|
|
|
Land, Total cost |
990
|
|
|
|
Buildings & Improvements, Total cost |
9,326
|
|
|
|
Total |
10,316
|
|
|
|
Accumulated Depreciation |
1,165
|
|
|
|
Net Real Estate |
$ 9,151
|
|
|
|
Year Construction/ Improvements |
1986
|
|
|
|
Date Acquired |
May 13, 2014
|
|
|
|
Taylor, Pennsylvania Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 22,422
|
|
|
|
Land, Initial Cost |
3,102
|
|
|
|
Buildings & Improvements, Initial Cost |
25,405
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
3,101
|
|
|
|
Buildings & Improvements, Total cost |
25,406
|
|
|
|
Total |
28,507
|
|
|
|
Accumulated Depreciation |
2,061
|
|
|
|
Net Real Estate |
$ 26,446
|
|
|
|
Year Construction/ Improvements |
2000
|
|
|
|
Year Construction/Improvements One |
2006
|
|
|
|
Date Acquired |
Jun. 09, 2014
|
|
|
|
Aurora, Colorado Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 0
|
|
|
|
Land, Initial Cost |
2,882
|
|
|
|
Buildings & Improvements, Initial Cost |
3,917
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
96
|
|
|
|
Land, Total cost |
2,882
|
|
|
|
Buildings & Improvements, Total cost |
4,013
|
|
|
|
Total |
6,895
|
|
|
|
Accumulated Depreciation |
408
|
|
|
|
Net Real Estate |
$ 6,487
|
|
|
|
Year Construction/ Improvements |
1983
|
|
|
|
Date Acquired |
Jul. 01, 2014
|
|
|
|
Indianapolis, Indiana Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 6,072
|
|
|
|
Land, Initial Cost |
502
|
|
|
|
Buildings & Improvements, Initial Cost |
6,422
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
287
|
|
|
|
Land, Total cost |
498
|
|
|
|
Buildings & Improvements, Total cost |
6,713
|
|
|
|
Total |
7,211
|
|
|
|
Accumulated Depreciation |
726
|
|
|
|
Net Real Estate |
$ 6,485
|
|
|
|
Year Construction/ Improvements |
1981
|
|
|
|
Year Construction/Improvements One |
2014
|
|
|
|
Date Acquired |
Sep. 03, 2014
|
|
|
|
Denver, Colorado Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 0
|
|
|
|
Land, Initial Cost |
1,621
|
|
|
|
Buildings & Improvements, Initial Cost |
7,071
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
243
|
|
|
|
Land, Total cost |
1,621
|
|
|
|
Buildings & Improvements, Total cost |
7,314
|
|
|
|
Total |
8,935
|
|
|
|
Accumulated Depreciation |
597
|
|
|
|
Net Real Estate |
$ 8,338
|
|
|
|
Year Construction/ Improvements |
1985
|
|
|
|
Date Acquired |
Oct. 31, 2014
|
|
|
|
Monroe, Michigan Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 10,479
|
|
|
|
Land, Initial Cost |
658
|
|
|
|
Buildings & Improvements, Initial Cost |
14,607
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
657
|
|
|
|
Buildings & Improvements, Total cost |
14,608
|
|
|
|
Total |
15,265
|
|
|
|
Accumulated Depreciation |
917
|
|
|
|
Net Real Estate |
$ 14,348
|
|
|
|
Year Construction/ Improvements |
2004
|
|
|
|
Date Acquired |
Dec. 23, 2014
|
|
|
|
Monroe, Michigan Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 7,335
|
|
|
|
Land, Initial Cost |
460
|
|
|
|
Buildings & Improvements, Initial Cost |
10,225
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
460
|
|
|
|
Buildings & Improvements, Total cost |
10,225
|
|
|
|
Total |
10,685
|
|
|
|
Accumulated Depreciation |
642
|
|
|
|
Net Real Estate |
$ 10,043
|
|
|
|
Year Construction/ Improvements |
2004
|
|
|
|
Date Acquired |
Dec. 23, 2014
|
|
|
|
Richardson, Texas Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 14,145
|
|
|
|
Land, Initial Cost |
2,728
|
|
|
|
Buildings & Improvements, Initial Cost |
15,372
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
66
|
|
|
|
Land, Total cost |
2,728
|
|
|
|
Buildings & Improvements, Total cost |
15,438
|
|
|
|
Total |
18,166
|
|
|
|
Accumulated Depreciation |
1,255
|
|
|
|
Net Real Estate |
$ 16,911
|
|
|
|
Year Construction/ Improvements |
1985
|
|
|
|
Year Construction/Improvements One |
2008
|
|
|
|
Date Acquired |
Mar. 06, 2015
|
|
|
|
Birmingham, Alabama Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 0
|
|
|
|
Land, Initial Cost |
650
|
|
|
|
Buildings & Improvements, Initial Cost |
2,034
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
19
|
|
|
|
Land, Total cost |
650
|
|
|
|
Buildings & Improvements, Total cost |
2,053
|
|
|
|
Total |
2,703
|
|
|
|
Accumulated Depreciation |
175
|
|
|
|
Net Real Estate |
$ 2,528
|
|
|
|
Year Construction/ Improvements |
1982
|
|
|
|
Year Construction/Improvements One |
2010
|
|
|
|
Date Acquired |
Mar. 20, 2015
|
|
|
|
Dublin, Ohio Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 4,306
|
|
|
|
Land, Initial Cost |
1,338
|
|
|
|
Buildings & Improvements, Initial Cost |
5,058
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
35
|
|
|
|
Land, Total cost |
1,338
|
|
|
|
Buildings & Improvements, Total cost |
5,093
|
|
|
|
Total |
6,431
|
|
|
|
Accumulated Depreciation |
387
|
|
|
|
Net Real Estate |
$ 6,044
|
|
|
|
Year Construction/ Improvements |
1980
|
|
|
|
Date Acquired |
May 28, 2015
|
|
|
|
Draper, Utah Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 12,891
|
|
|
|
Land, Initial Cost |
3,248
|
|
|
|
Buildings & Improvements, Initial Cost |
13,129
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
3,248
|
|
|
|
Buildings & Improvements, Total cost |
13,129
|
|
|
|
Total |
16,377
|
|
|
|
Accumulated Depreciation |
845
|
|
|
|
Net Real Estate |
$ 15,532
|
|
|
|
Year Construction/ Improvements |
2008
|
|
|
|
Date Acquired |
May 29, 2015
|
|
|
|
Hapeville, Georgia Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 7,376
|
|
|
|
Land, Initial Cost |
2,271
|
|
|
|
Buildings & Improvements, Initial Cost |
8,778
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
2,271
|
|
|
|
Buildings & Improvements, Total cost |
8,778
|
|
|
|
Total |
11,049
|
|
|
|
Accumulated Depreciation |
497
|
|
|
|
Net Real Estate |
$ 10,552
|
|
|
|
Year Construction/ Improvements |
1999
|
|
|
|
Year Construction/Improvements One |
2007
|
|
|
|
Date Acquired |
Jul. 15, 2015
|
|
|
|
Villa Rica, Georgia Industrial Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 3,737
|
|
|
|
Land, Initial Cost |
293
|
|
|
|
Buildings & Improvements, Initial Cost |
5,277
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
18
|
|
|
|
Land, Total cost |
293
|
|
|
|
Buildings & Improvements, Total cost |
5,295
|
|
|
|
Total |
5,588
|
|
|
|
Accumulated Depreciation |
236
|
|
|
|
Net Real Estate |
$ 5,352
|
|
|
|
Year Construction/ Improvements |
2000
|
|
|
|
Year Construction/Improvements One |
2014
|
|
|
|
Date Acquired |
Oct. 20, 2015
|
|
|
|
Taylorsville, Utah Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 9,782
|
|
|
|
Land, Initial Cost |
3,008
|
|
|
|
Buildings & Improvements, Initial Cost |
10,659
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
3,008
|
|
|
|
Buildings & Improvements, Total cost |
10,659
|
|
|
|
Total |
13,667
|
|
|
|
Accumulated Depreciation |
343
|
|
|
|
Net Real Estate |
$ 13,324
|
|
|
|
Year Construction/ Improvements |
1997
|
|
|
|
Date Acquired |
May 26, 2016
|
|
|
|
Fort Lauderdale, Florida Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 14,047
|
|
|
|
Land, Initial Cost |
4,117
|
|
|
|
Buildings & Improvements, Initial Cost |
15,516
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
4,117
|
|
|
|
Buildings & Improvements, Total cost |
15,516
|
|
|
|
Total |
19,633
|
|
|
|
Accumulated Depreciation |
204
|
|
|
|
Net Real Estate |
$ 19,429
|
|
|
|
Year Construction/ Improvements |
1984
|
|
|
|
Date Acquired |
Sep. 12, 2016
|
|
|
|
King of Prussia, Pennsylvania Office Building [Member] |
|
|
|
|
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] |
|
|
|
|
Encumbrances, Initial Cost |
$ 14,800
|
|
|
|
Land, Initial Cost |
3,681
|
|
|
|
Buildings & Improvements, Initial Cost |
15,739
|
|
|
|
Improvement Costs Capitalized Subsequent to Acquisition |
0
|
|
|
|
Land, Total cost |
3,681
|
|
|
|
Buildings & Improvements, Total cost |
15,739
|
|
|
|
Total |
19,420
|
|
|
|
Accumulated Depreciation |
35
|
|
|
|
Net Real Estate |
$ 19,385
|
|
|
|
Year Construction/ Improvements |
2001
|
|
|
|
Date Acquired |
Dec. 14, 2016
|
|
|
|